Notice of Differing Site Conditions Sample Clauses

Notice of Differing Site Conditions. If CM/GC believes it has encountered Differing Site Conditions, then CM/GC shall give Notice to Design Professional promptly before conditions are further disturbed, but in no event no later than four (4) days after the first observance of the Differing Site Condition. The Notice identified in this Section shall be in addition to the Notice set forth in Section 5.2.2.
AutoNDA by SimpleDocs
Notice of Differing Site Conditions. Contractor shall provide written notice to the Commission Project Manager of such matters set forth in Section 11.2 within three (3) Days of discovery. The notice shall describe the specific condition(s) identified, the cost and schedule implication(s), if any, and all proposed solutions to resolve the condition(s) identified. No request by Contractor for an adjustment to the Contract Price or for an extension of time under this Contract shall be considered by the Commission, unless the Contractor has given the written notice as required herein.
Notice of Differing Site Conditions. If either of the following conditions is encountered at the Site when digging trenches or other excavations that extend deeper than four feet below the surface within the area where Work for the Inmate Tunnel is being performed, Developer shall give a written notice of differing site conditions to County promptly before conditions are disturbed (except in an emergency as required by Section 12.6.), and in no event later than seven (7) days after first observance of (a) subsurface or latent physical conditions that differ materially from those indicated in this Agreement or (b) unknown physical conditions of an unusual nature or which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character for the Project provided for in this Agreement.

Related to Notice of Differing Site Conditions

  • Differing Site Conditions (a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site(s), of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.

  • Site Conditions A. Existing Site Conditions: Information with respect to the site of the Work given in drawings or specifications has been obtained by County's representatives and is believed to be reasonably correct, but the County does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all such information.

  • SUSPENSIVE CONDITIONS 18.1 The Contract is subject to the suspensive condition that the Purchaser obtains a loan in the amount reflected in clause 7 of the SCHEDULE, forming part of the Purchase price payable by the Purchaser to the Seller for the Property, from a bank or other financial institution, against the security of a first mortgage bond over the Property in favour of such bank or financial institution, such loan to be approved in writing by such bank or financial institution within the period stipulated in clause 9 of the SCHEDULE.

  • SUSPENSIVE CONDITION i) The contract only becomes binding and enforceable once:

  • Offense Level Calculations i. The base offense level is 7, pursuant to Guideline § 2B1.1(a)(1).

  • Mandatory Conditions (a) Should the Employee or the Union fail to comply with any time limit in the grievance procedure, the grievance will be considered to be abandoned, unless the Parties have mutually agreed in writing to extend the time limits.

  • Termination Conditions This Agreement terminates upon the earlier of any of the following events: 18.1. Podmínky ukončení platnosti smlouvy Platnost této smlouvy skončí, jakmile nastane kterákoliv z následujících událostí:

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • Space Conditions All pipes passing through floors, walls, and ceilings shall be installed with sufficient space between them to permit installation of pipe insulation and floor, wall, and ceiling plates without cutting of insulation or plates. Roughed-in dimensions shall be prepared by the Contractor to accomplish this requirement. The Contractor shall locate all equipment that must be serviced, operated, or maintained in fully accessible positions. This provision includes but is not limited to valves, traps, cleanouts, motors, controllers, switchgear, drain points, filter, access doors, and fire dampers. If spaces, dimensions, or other design conditions do not permit compliance with the present article, the Contractor shall file a request in writing with the Design Professional for additional instructions, furnishing a copy to the Owner.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!