Paper Submittals Sample Clauses

Paper Submittals. Architect will stamp each submittal with an action stamp and will xxxx xxxxx appropriately to indicate action.
AutoNDA by SimpleDocs

Related to Paper Submittals

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Required Submittals Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • ELECTRONIC SUBMITTALS 3.1. Submittal Exchange® (xxx.xxxxxxxxxxxxxxxxx.xxx) shall be used to provide an on-line database and repository, which shall be used to transmit and track project-related documents. The intent for using this service is to expedite the construction process by reducing paperwork, improving information flow, and decreasing submittal review turnaround time.

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • Progress Update Information included with the annual Data Access Request (DAR) renewal or Closeout summarizing the analysis of controlled-access datasets obtained through the DAR and any publications and presentations derived from the work.

  • Validation Review In the event OIG has reason to believe that: (a) Good Shepherd’s Claims Review fails to conform to the requirements of this CIA; or (b) the IRO’s findings or Claims Review results are inaccurate, OIG may, at its sole discretion, conduct its own review to determine whether the Claims Review complied with the requirements of the CIA and/or the findings or Claims Review results are inaccurate (Validation Review). Good Shepherd shall pay for the reasonable cost of any such review performed by OIG or any of its designated agents. Any Validation Review of Reports submitted as part of Good Shepherd’s final Annual Report shall be initiated no later than one year after Good Shepherd’s final submission (as described in Section II) is received by OIG. Prior to initiating a Validation Review, OIG shall notify Good Shepherd of its intent to do so and provide a written explanation of why OIG believes such a review is necessary. To resolve any concerns raised by OIG, Good Shepherd may request a meeting with OIG to: (a) discuss the results of any Claims Review submissions or findings; (b) present any additional information to clarify the results of the Claims Review or to correct the inaccuracy of the Claims Review; and/or (c) propose alternatives to the proposed Validation Review. Good Shepherd agrees to provide any additional information as may be requested by OIG under this Section III.D.3 in an expedited manner. OIG will attempt in good faith to resolve any Claims Review issues with Good Shepherd prior to conducting a Validation Review. However, the final determination as to whether or not to proceed with a Validation Review shall be made at the sole discretion of OIG.

  • Authoritative Root Database To the extent that ICANN is authorized to set policy with regard to an authoritative root server system (the “Authoritative Root Server System”), ICANN shall use commercially reasonable efforts to (a) ensure that the authoritative root will point to the top-­‐level domain nameservers designated by Registry Operator for the TLD, (b) maintain a stable, secure, and authoritative publicly available database of relevant information about the TLD, in accordance with ICANN publicly available policies and procedures, and (c) coordinate the Authoritative Root Server System so that it is operated and maintained in a stable and secure manner; provided, that ICANN shall not be in breach of this Agreement and ICANN shall have no liability in the event that any third party (including any governmental entity or internet service provider) blocks or restricts access to the TLD in any jurisdiction.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Submittal Review 7.10.1 The A/E shall review Submittals such as Shop Drawings, Product Data, and Samples for conformity with design intent and conformity with the Contract Documents within 14 days of receiving Submittals or in accordance with the approved submittal schedule, or other period as mutually agreed by the A/E and Contractor.