Paved Roads, Paved Lanes and Paved Walkways. (a) All catch basin leads, manhole frames and covers, water main valves, hydrant valves and valve operating mechanisms shall have been completed in the paved roads, paved lanes and paved walkways, prior to the acknowledgement of the Construction Completion Certificate for paved roads, paved lanes and paved walkways. (b) The paved road, paved lane and paved walkway surfaces shall be constructed except where: (i) the installation of the electric power, gas, telephone and cable utilities has caused the omission of construction of portions of the asphalt surface but the gravel base is in place, and in any event the total length of the omitted sections shall not exceed fifteen percent (15%) of the total length of the paved roads, paved lanes and paved walkways being constructed; or (ii) when the Manager, Urban Development deems it necessary to construct portions of any paved walkways at a later date to facilitate the landscaping with adjoining lots. (c) The construction of the said omitted sections of asphalt surface shall be constructed within one (1) year from the acknowledgement of the Construction Completion Certificate for the adjacent paved roads, paved lanes and paved walkways. (d) Should the omitted sections not be completed within one (1) year of the date from the acknowledgement of the Construction Completion Certificate, the maintenance period shall be extended one (1) year from the date of the completion of the omitted sections. (e) (i) Notwithstanding the foregoing, the placement of the final top lift asphalt may be omitted upon approval being given by the Manager, Urban Development.
Paved Roads, Paved Lanes and Paved Walkways including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms, and catch basin leads installed in paved road, paved lanes or paved walkways: Two (2) Winter Seasons, provided that: (a) the underground utilities have in the opinion of the Manager, Development Engineering been installed and compacted in other than winter conditions; (b) if installed in winter conditions, the backfilling has been properly compacted with granular material; or (c) Final Acceptance Certificates for all underground utilities have been issued.
Paved Roads, Paved Lanes and Paved Walkways. All paved roads, lanes, and walkways have been constructed to the proper cross section and grade in accordance with the Construction Drawings and Construction Specifications. All appurtenances have been adjusted to the proper grades and drainage has been properly accommodated. All pavement markings, traffic control signs, street name signs, and subdivisions signs have been installed, and the Subdivision Information Sign has been installed or revised. All Municipal Improvements proposed for construction within the roads, lanes, and walkway rights of way, as a part of this Development, have been installed. Where approval is granted by the Engineer, the final lift of asphalt may be delayed for a period of one year from the date of the Construction Completion Certificate for roads, in which case, a separate Construction Completion Certificate will be issued for roadway paving. The Engineer will not issue the Construction Completion Certificate for roadways until the signage and pavement marking drawing(s) have been provided by the Developer and approved by the Traffic Engineer.
Paved Roads, Paved Lanes and Paved Walkways. (a) All catch basin leads, manhole frames and covers, water main valves, hydrant valves and valve operating mechanisms shall have been completed in the paved roads, paved lanes and paved walkways, prior to the acknowledgement of the Construction Completion Certificate for paved roads, paved lanes and paved walkways. (b) The paved road, paved lane and paved walkway surfaces shall be constructed except where:
Paved Roads, Paved Lanes and Paved Walkways. All catch basin leads, manhole frames and covers, water main valves, hydrant valves and valve operating mechanisms shall have been completed in the paved roads, paved lanes and paved walkways, prior to the acknowledgement of the Construction Completion Certificate for paved roads, paved lanes and paved walkways.

Related to Paved Roads, Paved Lanes and Paved Walkways

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If ECI chooses to subtend a Verizon access Tandem, ECI’s NPA/NXX must be assigned by ECI to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 ECI shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from ECI’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office ECI utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow ECI’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Roads The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments.

  • Access to Project Site ‌ City will make available, no later than the commencement date designated in the current construction Schedule accepted by City, the lands and facilities upon which the Work is to be performed, including such access and other lands and facilities designated in the Contract Documents, for use by Contractor.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.