Traffic Engineer Sample Clauses

Traffic Engineer. Xxxxxx designed offsite improvements for the City of Mesa to serve the Apple manufacturing facility at the intersection of Signal Butte and Elliot Road. Under the XXXX delivery method, we designed half-street roadway improvements, revisions to drainage facilities, traffic signal relocations at Elliot Road and Signal Butte Road, a new signal at Signal Butte Road and the new south entrance, ITS, and street lighting.
AutoNDA by SimpleDocs
Traffic Engineer. Xxxxxx prepared alternative alignments through this residential and commercial corridor to expand the roadway to a seven-lane configuration. The design included significant utility relocation, right-of-way, new and interim traffic signals, and roadway lighting.
Traffic Engineer. Assist in review and management of a variety of traffic analysis projects. This includes the VISSIM model development/review, traffic analysis using Synchro, signal optimization and technical review required to evaluate transportation alternatives. Specific project responsibilities will include but are not limited to coordination of traffic signals; developing complex signal timing plans; traffic simulation development/review; developing specifications for traffic signal systems; safety studies, signal warrants and corridor analysis.
Traffic Engineer. It is hereby clarified that the above does not constitute an exhaustive list of the Office Holders on behalf of the Lead Design Firm, and it will be required to employ additional expert engineers on such dates and periods as may be required, in Israel and abroad, to grant all of the Services as specify in the Agreement.
Traffic Engineer. The Project Designer will employ Traffic Engineers to design the field of traffic, including traffic lights. The threshold requirements for the Traffic Engineers are as follows: 5.2.2.1 it has a degree in civil engineering from a recognized institution. 5.2.2.2 at the Submission Date it holds a Certified Engineer Certificate (יושיר סדנהמ תדועת), registered in the Registrar of Engineers and Architects in Israel. 5.2.2.3 the Traffic Engineer has at least ten (10) years of professional experience in it field of expertise and has the following professional experience: design traffic and traffic lights, the accumulative length of roads in such projects was at least ten (10) km, and provided that such roads included at least ten (10) signalized intersections;
Traffic Engineer. The City shall assign a Traffic Engineer to the Project. The Traffic Engineer will review, analyze and recommend appropriate mitigation regarding traffic engineering and impact studies associated with Lynnwood Link Extension project as it relates to Shoreline. Project Responsibilities will include: • Review of the station area multi-modal access assessments to ensure pedestrian, bus, bicycle and traffic needs are met and/or appropriately mitigated; • Review 30%, 60%, 90% and 100% Construction Permitting Submittal for traffic elements such as signals, channelization, signage and other traffic control devices; • Review construction phase traffic control, maintenance of traffic, and haul route plans for the project; • Work with neighborhoods to identify concerns and develop traffic calming and parking alternatives in alignment with the Neighborhood Traffic Safety Program; • Ensure Sound Transit’s traffic modeling accurately reflects existing and future conditions. Make sure Sound Transit’s impacts are incorporated into the City’s Traffic Model; • Assist with response to inquiries from City staff, Council and Citizens; and • Attend internal coordination meetings and meetings with Sound Transit staff and design consultants. The City shall assign a Senior Planner for the project. This position will conduct the design review process for the stations, garages, sites, and associated structures at the 30%, 60%, 90% & final phases. This position will coordinate all facets of development review: plans examination, zoning and design review, critical area review, site development and storm water and utilities coordination. Project responsibilities will include • Serve as the lead zoning reviewer and prepare comments on the 30%, 60%, 90% and 100% construction permitting submittal and associated reports for the stations, garages, sites, and associated structures for compliance with SMC Title 20; • Serve as lead reviewer for processing the following permit types: Special Use permit, Tree Removal permits, Lot Line Adjustments/Lot Mergers/Subdivisions, Demolition permits, Sign permits, Administrative Design Review, Temporary Use Permits, Interpretations of the Development Code, Variances, and Critical Area Special Use permit(s); • Attending weekly internal coordination meetings and ad hoc and biweekly agency coordination meetings regarding design and permitting as needed; • Updating the City's website & Currents with ongoing information about the project; • Responding to wal...

Related to Traffic Engineer

  • Geotechnical Engineer « »« » « » « » « » « »

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order. (b) The technical evaluation committee may call the responsive bidders for discussion or presentation to facilitate and assess their understanding of the scope of work and its execution. However, the committee shall have sole discretion to call for discussion / presentation. (c) Financial bids of only those bidders who qualify the technical criteria will be opened provided all other requirements are fulfilled. (d) AIIMS Jodhpur shall have right to accept or reject any or all tenders without assigning any reasons thereof.

  • Professional Engineering and Architect’s Services Professional Engineering and Architect’s Services are not permitted to be provided under this Agreement. Texas statutes prohibit the procurement of Professional Engineering and Architect’s Services through a cooperative agreement.

  • Contractor Sales Reporting Vendor Management Fee Contractor Reports Master Contract Sales Reporting. Contractor shall report total Master Contract sales quarterly to Enterprise Services, as set forth below. Master Contract Sales Reporting System. Contractor shall report quarterly Master Contract sales in Enterprise Services’ Master Contract Sales Reporting System. Enterprise Services will provide Contractor with a login password and a vendor number. The password and vendor number will be provided to the Sales Reporting Representative(s) listed on Contractor’s Bidder Profile. Data. Each sales report must identify every authorized Purchaser by name as it is known to Enterprise Services and its total combined sales amount invoiced during the reporting period (i.e., sales of an entire agency or political subdivision, not its individual subsections). The “Miscellaneous” option may be used only with prior approval by Enterprise Services. Upon request, Contractor shall provide contact information for all authorized purchasers specified herein during the term of the Master Contract. If there are no Master Contract sales during the reporting period, Contractor must report zero sales. Due dates for Master Contract Sales Reporting. Quarterly Master Contract Sales Reports must be submitted electronically by the following deadlines for all sales invoiced during the applicable calendar quarter: March 31: April 30 June 30: July 31 September 30: October 31 December 31: January 31 Vendor Management Fee. Contractor shall pay to Enterprise Services a vendor management fee (“VMF”) of 1.50 percent on the purchase price for all Master Contract sales (the purchase price is the total invoice price less applicable sales tax). The sum owed by Contractor to Enterprise Services as a result of the VMF is calculated as follows: Amount owed to Enterprise Services = Total Master Contract sales invoiced (not including sales tax) x .0150. The VMF must be rolled into Contractor’s current pricing. The VMF must not be shown as a separate line item on any invoice unless specifically requested and approved by Enterprise Services. Enterprise Services will invoice Contractor quarterly based on Master Contract sales reported by Contractor. Contractors are not to remit payment until they receive an invoice from Enterprise Services. Contractor’s VMF payment to Enterprise Services must reference this Master Contract number, work request number (if applicable), the year and quarter for which the VMF is being remitted, and the Contractor’s name as set forth in this Master Contract, if not already included on the face of the check. Failure to accurately report total net sales, to submit a timely usage report, or remit timely payment of the VMF, may be cause for Master Contract termination or the exercise of other remedies provided by law. Without limiting any other available remedies, the Parties agree that Contractor’s failure to remit to Enterprise Services timely payment of the VMF shall obligate Contractor to pay to Enterprise Services, to offset the administrative and transaction costs incurred by the State to identify, process, and collect such sums. The sum of $200.00 or twenty-five percent (25%) of the outstanding amount, whichever is greater, or the maximum allowed by law, if less. Enterprise Services reserves the right, upon thirty (30) days advance written notice, to increase, reduce, or eliminate the VMF for subsequent purchases, and reserves the right to renegotiate Master Contract pricing with Contractor when any subsequent adjustment of the VMF might justify a change in pricing. Annual Master Contract Sales Report. Upon request, Contractor shall provide to Enterprise Services a detailed annual Master Contract sales report. Such report shall include, at a minimum: Product description, part number or other Product identifier, per unit quantities sold, and Master Contract price. This report must be provided in an electronic format that can be read by compatible with MS Excel. Small Business Inclusion. Upon Request by Enterprise Services, Contractor shall provide, within thirty (30) days, an Affidavit of Amounts Paid. Such Affidavit of Amounts Paid either shall state, if applicable, that Contractor still maintains its MWBE certification or state that its subcontractor(s) still maintain(s) its/their MWBE certification(s) and specify the amounts paid to each certified MWBE subcontractor under this Master Contract. Contractor shall maintain records supporting the Affidavit of Amounts Paid in accordance with this Master Contract’s records retention requirements.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Contractor Project Manager The Contractor Project Manager shall serve, from the Effective Date, as the Contractor project manager and primary Contractor representative under this Agreement. The Contractor Project Manager shall (i) have overall responsibility for managing and coordinating the performance of Contractor’s obligations under this Agreement, including the performance of all Subcontractors; and (ii) be authorized to act for and bind Contractor and Subcontractors in connection with all aspects of this Agreement. The Contractor Project Manager shall respond promptly and fully to all inquiries from the JBE Project Manager.

  • Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA. (b) If the HSP is not subject to the procurement provisions of the BPSAA, the HSP will have a procurement policy in place that requires the acquisition of supplies, equipment or services valued at over $25,000 through a competitive process that ensures the best value for funds expended. If the HSP acquires supplies, equipment or services with the Funding it will do so through a process that is consistent with this policy.

  • Contractor Approach The Contractor shall develop, document, and implement BIDM Data Exchanges to obtain BIDM Imports from and to send BIDM Exports to CDPHE's CEDRS. 17.47.2.1. This exchange shall occur on a period as determined by the Department

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!