Performance tests before and after installation Sample Clauses

Performance tests before and after installation. The Contractor provides full ESP efficiency test results before and after the HFPS installation. The efficiency test before the HFPS installation is done after an outage, if possible, when the internal condition of the ESP is as good as possible. The measurements shall include as a minimum: • Gas volume flow – ESP inlet and outlet • ESP flue gas inlet temperature • Moisture in flue gas • Inlet and Outlet dust burden (dry gas and 10% O2) • Oxygen at ESP inlet and outlet • Coal proximate and ultimate analyses • Coal ash composition All efficiency measurements shall comply with the requirements of EN 13284-1. In the case where the unit is on an unexpected outage before the main installation and there is ample opportunity to install the HFPSs during such outage this will take preference. In this case the baseline test falls away and for that reason the baseline test should be costed as a take-out option. The test done before the HFPS installation shall serve as a baseline performance to the Employer. The performance tests after the HFPS installation must be conducted within the proving period of 3 months after commissioning. The Contractor must comply with the Quality Assurance standard EN14181 and ISO 9096. Particulate emission measurements must be carried out employing procedures and equipment which comply with the requirements of United States Environmental Protection Agency (USEPA, Method 17: Determination of particulate matter emissions from stationary sources.). The Contractor supplies the Employer with a formal performance test report after the completion of the performance test.
AutoNDA by SimpleDocs

Related to Performance tests before and after installation

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Examination of work before covering up In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • DISPOSAL COMPLETION Purchaser shall remove organic debris from the road surface, ditchlines, and culvert inlets and outlets. Purchaser shall complete all disposal of organic debris before the application of rock.

  • Performance Improvement Xxxxxx Permanente and the Coalition are competing in a challenging market that is characterized by a limited workforce, changes in technology, changes in clinical practice, cultural diversity, changing demographics and high demand for quality service. The parties are committed to the enhancement of organizational performance so that working in Partnership is the way Xxxxxx Permanente does business. Under this Agreement, the parties will work together to: » develop and invest in people, including the development of and investment in managers, supervisors and union stewards; » engage employees at all levels; » align the systems and processes that support the achievement of organizational and Partnership goals; » enhance the ability of Coalition unions to advance their social mission and the welfare of their members; » recognize and reduce parallel structures; » ensure joint management-union accountability for performance; » grow membership; » redesign work processes to improve effectiveness, efficiency and work environment; » develop and xxxxxx unit-based teams; » share and establish expectations regarding broad adoption of successful practices in areas such as service, attendance, workplace safety, workforce development, cost structure reduction, scope of practice and performance-based pay; and » communicate with employees on an ongoing basis regarding performance goals and targets, as well as performance results at all levels of the organization. Each regional LMP council shall develop approaches aimed at reducing variation between medical centers, facilities and departments in the resources available for partnership. In particular, such a plan should: » ensure at a regional level there is adequate time for teams to review performance, identify opportunities for improvement, and develop and test changes to drive improvement; and » provide regional or facility support to departments as needed to cross-cover or backfill and jointly determine the most cost-effective manner to provide the support.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

Time is Money Join Law Insider Premium to draft better contracts faster.