Phase 3 – Capacity Assessment Sample Clauses

Phase 3 – Capacity Assessment. Phase 3 of the analysis assessed the capacity usage on the Wessex mainline (SW105 route) where the Alliance aspirations are proposed to operate. The assessment covered from 05:00 until 22:59 as this time period covers when the Alliance aspirational paths are proposed to operate within. The assessment focused on selected compulsory timing points spread along the route; Clapham Junction, Farnborough, Winchester and Eastleigh. These four locations were chosen to represent the majority of the Southwest Main Line: Clapham Junction is the timing point that all Main Line services will travel through, Farnborough is the closest mandatory timing point to Winchfield, where all Alliance paths are assumed to change running lines, Winchester is the mandatory timing point in the 2-track section of the line and many services will originate or terminate at Eastleigh T&RSMD via Eastleigh station. The intention was to also undertake the assessment at Basingstoke, Woking and Southampton Central, however due the complexity of the operations at these locations it was not possible to carry out accurate analysis in the time available. The capacity for the December 18 Concept Train Plan was assessed by extracting the services from TPS, then interrogating them using excel to produce a list of routeings through each of the four locations, along with the number of services using each routeing in a given hour. The TPRs were then used to assign a capacity usage value to each routeing, which could be used to calculate the capacity usage in minutes during hour blocks. The capacity value for each routeing was calculated by separating each timing point out into platforms and lines at each side of the timing point and determining how soon after the given routeing that the line or platform could be occupied by another service. The capacity usage in an hour was averaged over the lines at either side of the timing point and the platforms and the maximum of these three averages was considered to be the capacity usage for the station in that hour. An identical assessment was then undertaken for the December 16 timetable to enable a comparison between the capacity usage in the current operating timetable and the proposed concept train plan.
AutoNDA by SimpleDocs

Related to Phase 3 – Capacity Assessment

  • Security Assessment If Accenture reasonably determines, or in good faith believes, that Supplier’s security practices or procedures do not meet Supplier’s obligations under the Agreement, then Accenture will notify Supplier of the deficiencies. Supplier will without unreasonable delay: (i) correct such deficiencies at its own expense; (ii) permit Accenture, or its duly authorized representatives, to assess Supplier’s security-related activities that are relevant to the Agreement; and (iii) timely complete a security questionnaire from Accenture on a periodic basis upon Accenture’s request. Security issues identified by Accenture will be assigned risk ratings and an agreed-to timeframe to remediate. Supplier will remediate all the security issues identified within the agreed to timeframes. Upon Supplier’s failure to remediate any high or medium rated security issues within the stated timeframes, Accenture may terminate the Agreement in accordance with Section 8 above.

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Screening and Assessment Grantee shall: 1. Comply with all applicable rules in the TAC for SUD programs as stated in the SUD UM Guidelines Information, Rules, and Regulations regarding Screening and Assessment. 2. When documenting a CMBHS Substance Use Disorder screening, Grantee shall conduct the screening in a confidential, face-to-face interview unless there is documented justification for an interview by phone. 3. Document Financial Eligibility in CMBHS as required in the SUD UM Guidelines. 4. Conduct and document a CMBHS SUD Initial Assessment with the client to determine the appropriate levels of care for SUD treatment. The CMBHS assessment will identify the impact of substances on the physical, mental health, and other identified issues including Tuberculosis, Hepatitis C, sexually transmitted infection (STI), and Human Immunodeficiency Virus (HIV). i. If client indicates risk for these communicable diseases, Grantee shall refer the client to the appropriate community resources for further testing and counseling. ii. If the client is at risk for HIV, Grantee shall refer the client to pre and post- test counseling on HIV. 5. Grantee will also consider referring to the TRA Statewide HIV Intensive Residential Treatment facility to concurrently address medical needs and SUD. 6. If a client is living with HIV, Grantee will refer the client to the appropriate community resources to complete the necessary referrals and health related paperwork. 7. The assessment shall be signed by a Qualified Credential Counselor (QCC) and filed in the client record within three (3) service days of admission or a program may accept an evaluation from an outside entity if it meets the criteria for admission and was completed during the thirty (30) business days preceding admission.

  • Needs Assessment The determination of whether the Annual Income of a family or individual occupying or seeking to occupy a Qualifying Unit complies with the requirements for Extremely Low-Income Households or Low- to Moderate-Income Households shall be made by the applicable housing authority in the CDBG-DR Program area prior to admission of such family or individual to occupancy of a Qualifying Unit.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).