Phase I (1998 Sample Clauses

Phase I (1998. 2002). This Agreement shall be implemented in three phases. Under Phase I, the District shall implement 1) juvenile and adult operating plans and criteria to meet the Survival Standards set forth in sub-Section 4.1 (Survival Standards) and 2) a monitoring and evaluation program to determine compliance with the standards. Following the completion of the three-year monitoring and evaluation program in Phase I, the Coordinating Committee will determine whether the pertinent survival standards have been achieved. Depending on the results of this determination, the District will either proceed to Phase II (if the applicable survival standard has not been achieved) or Phase III (if the applicable survival standards has been achieved). In addition, three separate sub-phases were established within Phase III. The three sub-Phase designations are referred to as Phase III (Standards Achieved), Phase III (Provisional Review) and Phase III (Additional Juvenile Studies). The Parties to this Agreement established separate sub-phases within Phase III as a way to address existing limitations in the measurement of adult survival and Juvenile Project Survival for sockeye and subyearling chinook (See Section 14, Figure 1). The Parties recognize that Douglas PUD has completed the three years of valid Juvenile Project Survival studies as documented in Section 15, Appendix B. The Parties further recognize that the District has achieved the 93% Juvenile Project Survival goal for yearling chinook and steelhead and that once this Agreement is implemented the District will move into Phase III (Standard Achieved) for these Plan Species. The District also recognizes that project survival information is currently limited for yearling chinook and steelhead originating from the Okanogan Basin. As a result, future Project Survival Studies (e.g. 10 year standards verification studies) shall consider and attempt to quantify the effect of the Xxxxx reservoir on Okanogan origin yearling chinook and steelhead. Measurement and evaluation of 91% Combined Adult and Juvenile Project Survival or 93% Juvenile Project Survival or the measurement or calculation of 95% Juvenile Dam Passage Survival will be assessed by the Coordinating Committee by 2002. Measurement of Juvenile Project Survival or Juvenile Dam Passage Survival during Phase I is expected to take three years to complete, unless additional years of study are agreed to by the Coordinating Committee. Juvenile survival studies conducted duri...
AutoNDA by SimpleDocs

Related to Phase I (1998

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Tuberculosis Examination The examination shall consist of an approved intradermal tuberculosis test, which, if positive, shall be followed by an X-ray of the lungs. Nothing in Sections 5163 to 5163.2, inclusive, shall prevent the governing body of any city or county, upon recommendation of the local health officer, from establishing a rule requiring a more extensive or more frequent examination than required by Section 5163 and this section. § 5163.2. Technician taking X-ray film; Interpretation of X-ray The X-ray film may be taken by a competent and qualified X-ray technician if the X-ray film is subsequently interpreted by a licensed physician and surgeon.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Musculoskeletal Injury Prevention and Control (a) The Hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Alcohol and Drug Testing Employee agrees to comply with and submit to any Company program or policy for testing for alcohol abuse or use of drugs and, in the absence of such a program or policy, to submit to such testing as may be required by Company and administered in accordance with applicable law and regulations.

  • Treatment Program Testing The Employer may request or require an employee to undergo drug and alcohol testing if the employee has been referred by the employer for chemical dependency treatment or evaluation or is participating in a chemical dependency treatment program under an employee benefit plan, in which case the employee may be requested or required to undergo drug or alcohol testing without prior notice during the evaluation or treatment period and for a period of up to two years following completion of any prescribed chemical dependency treatment program.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

Time is Money Join Law Insider Premium to draft better contracts faster.