Phase II Control Sample Clauses

Phase II Control. For all Phase II implementations, regional playback control systems must be implemented in a manner such that the region setting is either a programmed element contained in the DVD Drive or fixed in the DVD Drive Hardware. The Phase II regional playback control system may allow (i) the end user to directly set the region a maximum of five times, and (ii) a maximum of five reinitializations of end-user's ability to directly set the region five times, provided that such reinitializations may be accomplished only using a secure method based on specialized equipment available only to authorized service or manufacturing centers. Hence, the total number of drive region resets available to an individual user must be no more than
AutoNDA by SimpleDocs
Phase II Control. For all Phase II implementations, regional playback control systems must be implemented in a manner such that the region setting is either a programmed element contained in the DVD Drive or fixed in the DVD Drive Hardware. The Phase II regional playback control system may allow (i) the end user to directly set the region a maximum of five times, and (ii) a maximum of five reinitializations of end-user's ability to directly set the region five times, provided that such reinitializations may be accomplished only using a secure method based on specialized equipment available only to authorized service or manufacturing centers. Hence, the total number of drive region resets available to an individual user must be no more than 25. Renewal of a drive to be provided to a new user may be done only by a DVD Drive manufacturer thereby allowing the end user direct setting and reinitialization process described above to be started again for the new user. The user reset and service or manufacturing center reinitialization provisions of this subparagraph shall not apply to a Special Purpose DVD Drive, which may be designated to play back only those DVD Discs designated as Region 8. DVD Drives that are not Special Purpose DVD Drives shall not play back those DVD Discs designated as Region 8, either through initial setting or through consumer reset or service or manufacturing center reinitialization. A Special Purpose DVD Drive is permitted to be sold only in conformance with the conditions set forth in the License Agreement that are specific to the sale of Special Purpose DVD Drives.

Related to Phase II Control

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer. b. The kinds and frequency of erosion control structures shall be adjusted to soil types, topography and climatic conditions as directed by the Forest Officer. c. The Purchaser is required to recontour any excavated skid trails, and provide for effective erosion control in the trail location as directed by the Forest Officer. d. Erosion control work shall commence as soon as skidding is completed on each skid trail or landing, and must be kept current with unit operations. e. Erosion control work shall be completed and approved by the Forest Officer in unfinished units before operations cease for inactive periods including heavy winter snowfall, spring breakup and restricted dates. f. All erosion control work in each unit shall be completed prior to notification pursuant to Section VII.M.7.

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • EVENTS OUTSIDE OUR CONTROL 10.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of our obligations under this XXXX that is caused by any act or event beyond our reasonable control, including failure of public or private telecommunications networks (Event Outside Our Control). 10.2 If an Event Outside Our Control takes place that affects the performance of our obligations under this XXXX: (a) our obligations under this XXXX will be suspended and the time for performance of our obligations will be extended for the duration of the Event Outside Our Control; and (b) we will use our reasonable endeavours to find a solution by which our obligations under this XXXX may be performed despite the Event Outside Our Control.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 2024.

  • Pest Control Upon award, the Contractor shall manage all insect, weed and pest problems (as defined by Chapter 482, F.S.). In addition, any damage caused by pests during the implementation of the pest control program shall be immediately corrected by replacement with healthy turf or plants at the Contractor's expense. Pest Control program shall include, at a minimum, the following: 1) The Contractor shall inspect the entire property, including turf areas, shrubs, trees (including palms), and plants on a weekly basis for any pest infestation. All infestations, including disease, weeds, fire ants or other pests, shall be treated immediately upon discovery and notification by Performance Administrator or the Contractor. The County Performance Administrator must be informed of infestations discovered and treatments applied via email within 24 hours and included on the Monthly Vendor Inspection Report. All applications of pesticides shall be properly labeled by placards. 2) Application must comply with manufacturer’s recommendations. Every chemical substance used must be on the list of chemical substances or have been submitted for inclusion on such list, as compiled by the Environmental Protection Agency (EPA) pursuant to the Toxic Substances Control Act and in compliance with all Federal, State, and local pesticide laws and ordinances. Materials and application shall meet all Federal Health and Safety Laws currently in effect. Safety Data Sheets (SDS) must be submitted in writing two (2) days prior to contract start date or before the use of a new approved chemical intended for use on this contract. All chemicals used must carry an EPA approved number. 3) Pest Control Services shall be performed according to Integrated Pest Management Strategies to control all insect, wee, and pest problems as defined by all sections under Chapter 482, Florida Statues including proper licensure whether by the Contractor or a sub- contractor to be supplied with pre-bid package.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!