Pillars of Wellness Sample Clauses

Pillars of Wellness. 1. Role model of health
AutoNDA by SimpleDocs
Pillars of Wellness. 1. Role model of health 2. Culture of healthy living

Related to Pillars of Wellness

  • HOURS OF WORK AND SCHEDULING 15.01 The normal hours of work for an employee are not a guarantee of work per day or per week, or a guarantee of days of work per week. The normal hours of work shall be seven and one-half (7-1/2) hours per day, and seventy-five (75) hours in any bi-weekly period.

  • HOURS OF WORK AND WORKING CONDITIONS 16.01 The following paragraph is intended to define the normal hours of work and shall not be construed as a guarantee of hours of work per day, or per week, or of days of work per week.

  • HOURS OF WORK & OVERTIME (Subject to implementation instructions, the following clauses will appear in all collective agreements replacing any provision related to the Work Week and Work Day, Rest Periods, Overtime Definitions, Overtime/Callback Accumulation, Missed Meal Breaks, Meal Allowance, Time Off Between Shifts, and Change of Schedule that existed in the Hospital’s expiring collective agreement:)

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • – HOURS OF WORK & SCHEDULING 15.01 The normal hours of work for an employee are not a guarantee of work per day or per week, or a guarantee of days of work per week. The normal hours of work shall be seven and one-half (7½) hours per day, and seventy-five (75) hours in any bi-weekly period.

  • HOURS OF WORK AND OVERTIME 12.01 The following paragraphs and sections are intended to define the normal hours of work and shall not be construed as a guarantee of hours of work per day or per week, or of days of work per week.

  • CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.

  • HOURS OF WORK AND WORK SCHEDULES 22.01 Except for employees subject to a particular work schedule according to clause 22.10, the duration of the regular work week is established at thirty-five (35) hours generally worked between 9:00 and 17:00 from Monday to Friday.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

Time is Money Join Law Insider Premium to draft better contracts faster.