Predesign Phase Services Sample Clauses

Predesign Phase Services. The purpose of the predesign task is to update and document the basis of design approach for the CT tanks painting project. Subtasks: ▪ Review record drawings, previous condition assessment reports, and relevant construction records. ▪ Conduct a site visit to observe the current condition of the interior (of one tank) and the exterior of both tanks to provide the updated basis of the final design. CT Water Tanks Painting Improvements Proposal ▪ Check the exterior paint test patch status that was applied in 2018. ▪ Collect a sample of the exterior paint from each tank for laboratory analysis to check for regulated metals. ▪ Conduct a telephonic tank painting design approach conference call with at least one Alaska based tank painting contractor. ▪ Conduct a preliminary design concept review with the expected ADEC plan review engineer to assess the acceptability of CT Tank baffle removal. (We had a preliminary discussion with Xxxxx Xxxxxxxxxx/ADEC office of drinking water on March 17th about the CT Tank baffle removal concept. From our initial discuss no problems were identified with removing the baffles, provided that we submit an engineering report that demonstrates at least 4-log virus inactivation will be met in the unbaffled tank configuration. There is some risk that ADEC will want at least a few baffle panels left in each tank.)
AutoNDA by SimpleDocs

Related to Predesign Phase Services

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Support Services HP’s support services will be described in the applicable Supporting Material, which will cover the description of HP’s offering, eligibility requirements, service limitations and Customer responsibilities, as well as the Customer systems supported.

Time is Money Join Law Insider Premium to draft better contracts faster.