Preliminary Sampling and Analysis Workplan Sample Clauses

Preliminary Sampling and Analysis Workplan. The Agency may submit a workplan that describes the activities proposed to perform an initial investigation of soil, groundwater, surface water, and/or air contamination associated with a Property or group of Properties. For any sampling activities to be conducted, the workplan will include a quality assurance/quality control plan, sampling plan, and implementation schedule.
AutoNDA by SimpleDocs

Related to Preliminary Sampling and Analysis Workplan

  • DATA COLLECTION AND ANALYSIS The goal of this task is to collect operational data from the project, to analyze that data for economic and environmental impacts, and to include the data and analysis in the Final Report. Formulas will be provided for calculations. A Final Report data collection template will be provided by the Energy Commission. The Recipient shall: • Develop data collection test plan. • Troubleshoot any issues identified. • Collect data, information, and analysis and develop a Final Report which includes: o Total gross project costs. o Length of time from award of bus(es) to project completion. o Fuel usage before and after the project.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Evaluation Schedule CLIENT REFERENCES The Tenderer shall provide details of his performance on each of the previous projects listed in the “Relevant Experience” returnable schedule. “Client Reference Scorecards” will be completed by each of the respective Clients for the projects listed in the “Relevant Experience” returnable schedule. The following are to be completed by the Client and Principal Agent and is to be supported in each case by a letter of award and the works completion certificate. Both Client and Principal Agent must sign and stamp the documents, failure to obtain both signatures and stamps will result in no allocation of points. PROJECT NAME and SCOPE OF WORK: Principal agent: ................................................................................................................................. Client: .. ..............................................................................................................................................

  • Design Review At appropriate stages of design, documented reviews of the design results shall be planned and conducted. Participants at each Design Review shall include representatives of all functions concerned with the design stage being reviewed, as well as other specialist personnel, as required. Records of such reviews shall be maintained. Any computer software used to perform alternative calculations or verify clearances through the use of scale models or computer-aided design and drafting (CADD) techniques shall be validated before the use of the application, with validation documented in accordance with Section 2.2.15. In addition, at each submittal to IFA for review, Developer shall provide hand calculations that validate any calculations performed by computer software.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.