Preventative Maintenance Procedures Sample Clauses

Preventative Maintenance Procedures. At least sixty (60) days prior to the O&M Commencement Date, Con Edison shall provide the Power Authority a copy of its current preventative maintenance procedures (“PMP”) for the Facility, including but not limited to CE-ES-1000 (attached hereto as Appendix D), which shall be subject to the Power Authority’s review, comment, and approval. Con Edison and the Power Authority shall work in good faith to review and finalize the PMP (“Finalized PMP”) at least 30 days prior to the O&M Commencement Date. The Power Authority has the final authority with regard to extending and/or reducing the periodicity of maintenance and testing beyond the time periods as long as it is consistent with all regulatory requirements, including but not limited to the NERC Reliability Standards, NPCC Reliability Standards, NPCC Directories and NPCC Criteria Requirements. The Power Authority retains the right but is not limited to request modifications to the Finalized PMP throughout the Term of this Second Composite Agreement on sixty (60) days prior written notice to Con Edison (“PMP Proposal”).
AutoNDA by SimpleDocs
Preventative Maintenance Procedures. PM procedures are defined in the job plans or job instruction codes resident in CMMS, and provided for reference in the Technical Reference Library. The Contractor shall use CMMS to manage its PM program. The Contractor activities shall include updating records, procedures, job plans tasks nameplate data, scheduling, and recommending improvements to GRC’s PM program. . The data entered in CMMS becomes the property of the Government. Samples of PM Work Instructions are attached in Section J Attachment X-X-9.4.3.

Related to Preventative Maintenance Procedures

  • Preventative Maintenance Standards of applicable Professional Governing Body. Anesthesia and surgical equipment maintenance standards as per manufacturer specifications and guidelines, subject to review and acceptance by AHS.

  • Maintenance Programme 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Corrective Maintenance ‌ Corrective Maintenance as referred to herein shall mean Repair and/or Replacement Services. For the purposes of evaluating whether Corrective Maintenance qualifies as either Minor or Major Corrective Maintenance, the Contractor shall calculate the total cost of the Corrective Maintenance in accordance with the following formulas, and the cost shall be calculated per Repair Item which shall be compared to the Major/Minor Corrective Maintenance Threshold listed in Table 2. Total Cost of Repair Item = (Labor Cost) + (Material Cost) Where: Labor Cost = (H) x [(1 + LMR/100) x (PWR + SB)] H = Number of labor hours needed to complete the Corrective Maintenance LMR = Labor Markup Rate (%) PWR = Prevailing Wage Rate SB = Supplemental Benefits Material Cost = (Cost of Materials) x (1 + MMR/100) Where: MMR = Materials Markup Rate (%) The Contractor’s Monthly Maintenance fee shall include, but is not necessarily limited to, all preventative maintenance service and all corrective maintenance service with a total cost (labor and materials) less than or equal to the thresholds listed in the following table, which shall be referred to as ‘Minor Corrective Maintenance: Table 2: Corrective Maintenance Thresholds Lot(s) Type of Equipment Major/Minor Corrective Maintenance Threshold 1 Gearless Traction Elevators $2500 1 Geared Traction Elevators $2500 2 Hydraulic Elevators $1000 3 Escalators $2500 4 Wheelchair Lifts $500 4 Stage Lifts $500 4 Dumbwaiters $500 Corrective maintenance work that has a Total Cost that exceeds these thresholds shall be considered Major Corrective Maintenance. The Contractor shall justify all costs for Major Corrective Maintenance to the Authorized User’s satisfaction, and for Repair Items that qualify as Major Corrective Maintenance the Contractor shall be compensated for the full cost of the work unless the corrective maintenance is determined to be the result of the Contractor’s negligence, in which case the Contract shall not be additionally compensated. Prior to performing any Major Corrective Maintenance, the Contractor shall submit a Cost Proposal to the Authorized User for approval. The Cost Proposal shall be a maximum, not to exceed price; shall include all labor and material costs associated with the Major Corrective Maintenance and shall be calculated on a per item basis (like items shall not be combined in the calculation). Upon approval, a letter authorizing the work will be issued by the Authorized User and a copy of such letter must accompany the invoice for the Major Corrective Maintenance services. Please note that if subcontractors are to be used, the requirements of Section 2.22 ‘Subcontracting of Work’ shall be met.

  • Maintenance Plan Maintenance plan for the Project Facility for the next quarter and a report on maintenance carried out during the previous quarter (including any material deviation from expected maintenance activities as set out in the maintenance plan).

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Maintenance and Support Services As long as you are not using the Help Desk as a substitute for our training services on the Tyler Software, and you timely pay your maintenance and support fees, we will, consistent with our then-current Support Call Process:

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.