Producing/Stockpiling Aggregates and RAP Sample Clauses

Producing/Stockpiling Aggregates and RAP. 36 Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02. 37 Sufficient storage space shall be provided for each size of aggregate and RAP. Materials 38 shall be removed from stockpile(s) in a manner to ensure minimal segregation when 39 being moved to the HMA plant for processing into the final mixture. Different aggregate 40 sizes shall be kept separated until they have been delivered to the HMA plant. 41 42 5-04.3(5)A Vacant 44 5-04.3(6) Mixing 45 After the required amount of mineral materials, asphalt binder, recycling agent and anti- 46 stripping additives have been introduced into the mixer the HMA shall be mixed until 47 complete and uniform coating of the particles and thorough distribution of the asphalt 48 binder throughout the mineral materials is ensured. 2 When discharged, the temperature of the HMA shall not exceed the optimum mixing 3 temperature by more than 25°F as shown on the reference mix design report or as 4 approved by the Engineer. Also, when a WMA additive is included in the manufacture of 5 HMA, the discharge temperature of the HMA shall not exceed the maximum 6 recommended by the manufacturer of the WMA additive. A maximum water content of 2 7 percent in the mix, at discharge, will be allowed providing the water causes no problems 8 with handling, stripping, or flushing. If the water in the HMA causes any of these 9 problems, the moisture content shall be reduced as directed by the Engineer. 10 11 Storing or holding of the HMA in approved storage facilities will be permitted with 12 approval of the Engineer, but in no event shall the HMA be held for more than 24 hours. 13 HMA held for more than 24 hours after mixing shall be rejected. Rejected HMA shall be 14 disposed of by the Contractor at no expense to the Contracting Agency. The storage 15 facility shall have an accessible device located at the top of the cone or about the third 16 point. The device shall indicate the amount of material in storage. No HMA shall be 17 accepted from the storage facility when the HMA in storage is below the top of the cone 18 of the storage facility, except as the storage facility is being emptied at the end of the 19 working shift. 21 Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior 22 to entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is 23 evidence of the recycled asphalt pavement not breaking down during the heating and 24 mixing of the H...
AutoNDA by SimpleDocs
Producing/Stockpiling Aggregates and RAP. 30 Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02. 31 Sufficient storage space shall be provided for each size of aggregate and RAP. Materials 32 shall be removed from stockpile(s) in a manner to ensure minimal segregation when 33 being moved to the HMA plant for processing into the final mixture. Different aggregate 34 sizes shall be kept separated until they have been delivered to the HMA plant. 35 36 5-04.3(5)A Vacant

Related to Producing/Stockpiling Aggregates and RAP

  • Transporting Students Teachers shall not be required to transport a student in a private vehicle on behalf of the school.

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Unbundled Loop Concentration 2.8.5.1 Upon the Effective Date of this Amendment, the Unbundled Loop Concentration (ULC) element will no longer be offered by BellSouth and no new orders for ULC will be accepted. Any existing ULCs that were provisioned prior to the Effective Date of this Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to this Amendment and may remain connected, maintained and repaired according to BellSouth’s TR73600 until such time as they are disconnected by MyLineToo, or BellSouth provides ninety (90) calendar days notice that such ULC must be terminated.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Act Identifier Title Shoulder note Iron Ore (Robe River) Agreement Xxx 0000 First Schedule Iron Ore (Robe River) Agreement Second Schedule First variation agreement Third Schedule Second variation agreement [s. 3B] Fourth Schedule Third variation agreement [s. 2] Fifth Schedule Fourth variation agreement Sixth Schedule Fifth variation agreement

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • UNE Port/Loop Combinations 5.3.1 Combinations of port and loop unbundled Network Elements along with switching and transport unbundled Network Elements provide local exchange service for the origination or termination of calls. Port/loop combinations support the same local calling and feature requirements as described in the Unbundled Local Switching or Port section of this Attachment and the ability to presubscribe to a primary carrier for intraLATA toll service and/or to presubscribe to a primary carrier for interLATA toll service.

  • Commingling Assets The assets of your IRA cannot be commingled with other property except in a common trust fund or common investment fund.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!