Design Report definition

Design Report the Phase 1 Design Report and any other report prepared by the Supplier with the assistance of the Participating Railway for each network build out phase of the HER Network detailing network implementation works by country;
Design Report shall have the meaning as set forth in Clause 13.4.2; “Dispute” shall have the meaning as set forth in Clause 39.1.1;
Design Report. Prepare final design report documenting design criteria, assumptions, and decisions. QA/QC – WGM Principal Engineers and Construction Project Manager will review the design plans and contract documents for quality control. Agency Review Coordination – Coordinate as necessary with City, MDT, and UM staff during the design review phase. It is anticipated that there will be one (1) design review meeting with all review agencies, to be held in Missoula. Final Plan Revisions – Make revisions to plans, specifications, and estimate based on comments received from reviewers at the City, the University, and MDT. Submit revised plans for one final review (no review meeting anticipated for this step). Address final comments without additional submittal/review.

Examples of Design Report in a sentence

  • The sub-soil exploration report including the complete details of boring done, analyses and interpretation of data and the selection of design parameters shall be included as an Appendix to the Design Report.

  • Before the occupation of the development approved under this permit, the project must incorporate the water sensitive urban design initiatives listed in the endorsed Water Sensitive Urban Design Report to the satisfaction of the Responsible Authority, and thereafter maintained to the satisfaction of the Responsible Authority.

  • A Noise Abatement Design Report (NADR) shall be furnished by the Design-Builder.

  • Review of a Remedial Action Design Report - NR 724.09, [148] - Include a fee of $1050.

  • Before the development starts (other than demolition or works to remediate contaminated land) a Water Sensitive Urban Design Report that outlines proposed water sensitive urban design initiatives must be submitted to, be to the satisfaction of and approved by the Responsible Authority.

  • The sub-soil exploration report including the complete details of boring done, analyses and interpretation of data and the selection of design parametres shall be included as an Appendix to the Design Report.

  • A Remedial Actions Options and Design Report will be submitted to the Department after completion of the Redevelopment Site Investigation Report.

  • The Design Report also shall present CONSULTANT' s recommendations as to how the construction contract(s) should be let out for bid.

  • A.2.4. Furnish five (5) copies of the Design Report, schedule and conduct a meeting with OWNER to present the Design Report for OWNER' s review and approval.

  • The Design Report also shall contain CONSULTANT' s professional evaluation of OWNER' s Project budget.


More Definitions of Design Report

Design Report means the report that accompanies the storm water management plan and includes data used for engineering analysis, results of all analysis, design and analysis calculations (including results obtained from computer programs), and other engineering data that would assist the City Engineer in evaluating proposed storm water management facilities.
Design Report means the report prepared by R.V. Anderson Associates Limited and titled “Deep Lake Water Cooling Expansion ProjectConceptual Design Report – Second Submission” dated October 4, 2019, including the associated "TW Comments and Response Log" and related supporting documents and any further amendments arising therefrom, and the project performance specifications to be developed by Enwave hereafter, all as may be acceptable to the General Manager and Enwave, each acting reasonably.
Design Report means the hard copy report that identifies the facilities, design philosophy, and design assumptions and criteria for potable, irrigation, and sanitary sewer systems.

Related to Design Report

  • GLJ Report means the independent engineering reserves evaluation of certain oil, NGL and natural gas interests of the Company prepared by GLJ dated February 11, 2022 and effective December 31, 2021.

  • Verification Report As defined in Section 4.19.

  • Inspection Report means the report delivered by the Master Servicer or the Special Servicer, as the case may be, substantially in the form of Exhibit L hereto.

  • Project Report means a summary statement of the likely environmental effects of a proposed development referred to in section 58;

  • CREFC® Operating Statement Analysis Report The monthly report in the “Operating Statement Analysis Report” format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • Evaluation Report means a report on the evaluation of tenders prepared under CSO 12

  • CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.

  • ESDM Report means the Emission Summary and Dispersion Modelling Report prepared in accordance with the Procedure Document by Envision Compliance and dated July 3, 2007 submitted in support of the application, and includes any amendments to the ESDM Report listed in Schedule A and all up-dated ESDM Reports prepared as required by the Documentation Requirements conditions of this Certificate.

  • Technical Report means a report prepared and filed in accordance with this Instrument and Form 43-101F1 Technical Report that includes, in summary form, all material scientific and technical information in respect of the subject property as of the effective date of the technical report; and

  • Condition Report means a condition report with respect to a Program Vehicle, signed and dated by the Servicer and a Manufacturer or its agent in accordance with the applicable Manufacturer Program.

  • Progress Report means the report similar in form and content to that attached hereto as Appendix III.

  • Cost Report means a report detailing all costs incurred in relation to the Activity, to be submitted by the Incubatee to the Incubator.

  • MI Report means a report containing Management Information submitted to the Authority in accordance with Framework Schedule 8 (Management Information);

  • Final Report means the report described as a final report in 14 RCW 42.17.080(2).

  • Exception Report The report of the Trustee referred to in Section 2.02.

  • Monthly Maintenance Statement shall have the meaning set forth in Clause 19.6;

  • Summary report means the year end report containing the summary of a

  • Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.

  • Collection Report means the monthly report prepared by the Primary Servicer setting forth, with respect to each Mortgage Loan and the most recently ended Collection Period prior to the due date of such report, the information described on Exhibit G attached hereto.

  • City Ledger Report means a list submitted by the Contractor indicating on a daily basis its total number of sleeping room nights rented as well as the total number for sleeping rooms removed from its available inventory or rentals, for purposes of repair.

  • Compliance Statement is that certain statement in the form attached hereto as Exhibit B.

  • ORSA summary report means a confidential high-level summary of an insurer or insurance group's ORSA.

  • Pick Up Report means the report detailing the number of sleeping rooms per day actually used out of the Program’s room block.

  • Valuation Report means the valuation report or reports for mortgage purposes, in the form of the pro-forma contained in the Standard Documentation, obtained by the Seller from a Valuer in respect of each Mortgaged Property or a valuation report in respect of a valuation made using a methodology which would be acceptable to a reasonable prudent mortgage lender;

  • Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.