Project Setting and Operations. ‌ The Rocky Reach Project, the eighth dam upstream from the mouth of the Columbia River, is a run-of-river hydroelectric project with limited ability to modify river flows. The Project has an allowable forebay fluctuation of four feet, with minimum forebay elevation of 7033 and maximum of 707 feet for normal operation (710 under special flood control operation). However, in consideration of system reliability for the regional electric grid, the Project rarely allows the forebay elevation to drop below 704 feet. The forebay elevation is usually maintained between 706 and 707 feet. The forebay elevation has been above 706 feet over 73% of the time and within two feet of elevation 707 approximately 98% of the time, with average forebay elevation at 706.22 feet over a ten year period (1992-2001). The Project’s tailrace elevation averaged 617.59 over the same time period. The maximum tailwater elevation during this period was 635.2 feet (June 12, 1997) and minimum was 610.7 feet (April 21, 1998). Tailwater elevation is determined primarily by Project discharge, which is managed under the 1997 Agreement for the Hourly Coordination Agreement, as described later in this Section. On a daily basis, minimum and maximum discharge is related to the fluctuation in flows released from upstream federal dams, the Grand Coulee Project and Chief Xxxxxx Project. The Rocky Reach Reservoir (Reservoir) is 43 miles long, with an annual average flow of 113,200 cfs (1973-2001) since completion of Canadian storage reservoirs. The minimum daily average flow from 1973-2001 was 25,100 cfs (November 11, 1973) and the maximum daily average flow was 358,000 cfs (June 12, 1997). The surface area of the Reservoir is approximately 8,235 acres at a flow of 100,000 cfs and forebay elevation of 707 feet. The gross storage capacity of the Reservoir at 100,000 cfs is 387,500 acre-feet. The volume of water that the Reservoir can contain between the minimum and maximum forebay elevation is 36,400 acre- feet. This storage is useable for capturing or augmenting flow on an hourly basis. If inflow to the Project ceased, the Reservoir’s useable storage would be sufficient only to run the plant for about two hours. The inflow to the Project is primarily determined by operations of the FCRPS, which is composed of the federal dams and the accompanying electrical system on the Columbia and Snake Rivers in Oregon, Washington, and Idaho. The dams are operated by Reclamation and the U.S. Army Corps of Engineer...
AutoNDA by SimpleDocs

Related to Project Setting and Operations

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Management and Operations 15.1 The Operator shall prepare an annual work programme and budget for each Calendar Year during the term of this Agreement. Each such work programme and budget shall set out in reasonable details, the work to be carried out, facilities to be purchased or created, training and employment programme, establishment, salaries and wages, social welfare schemes to be undertaken, and an estimate of the Expenditure to be incurred. The Operator shall present such work programme and budget to the Government and the Working Interest Owners before the start of each Calendar Year and thereafter provide a quarterly update on the implementation of such work programme and budget.

  • Application and Operation Subject Matter Clause No.

  • Variation and Operation Pursuant to and subject to clause 5 of the State Agreement the parties agree to amend the State Agreement in the manner set out in this Agreement.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. Purchaser may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net scale in percentage of gross scale, or based on the merchantability factor, whichever is stated in A2. If necessary to assess extent of defect, Purchaser shall make sample saw cuts or wedges. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Delegation and Operation OF TOP–LEVEL DOMAIN; REPRESENTATIONS AND WARRANTIES

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.