Protection of Groundwater Xxxxx and Remediation System Components Sample Clauses

Protection of Groundwater Xxxxx and Remediation System Components. Prior to the start of construction, contractors for the Navy and MEW Companies will show the developers the locations of all of the groundwater extraction and monitoring xxxxx in the field. Before initiating building demolition or other construction work, the project developer’s contractors shall install brightly painted steel pipes or bollards around each groundwater monitoring or extraction well. The painted pipe shall extend above ground not less than four feet, so as to be highly visible, and shall be buried sufficiently below the ground surface to protect the wellhead. Alternative equivalent well protection measures may be used by the project developer provided the alternative is approved in writing by the MEW Companies’ or the Navy’s contractor. The developer’s contractor shall provide and place steel plate or equivalent protective measures over the existing MEW Companies’ and Navy’s pipelines and power and control conduits. Additionally, all site construction work within two feet of all groundwater xxxxx shall be performed manually with hand tools. Fine grading work performed in areas more than two feet from the xxxxx but within close proximity shall be performed by light grading equipment.
AutoNDA by SimpleDocs

Related to Protection of Groundwater Xxxxx and Remediation System Components

  • Hazardous Materials; Remediation (a) If any release or disposal of Hazardous Materials shall occur or shall have occurred on any real property or any other assets of any Borrower or any other Credit Party, such Borrower will cause, or direct the applicable Credit Party to cause, the prompt containment and removal of such Hazardous Materials and the remediation of such real property or other assets as is necessary to comply with all Environmental Laws and to preserve the value of such real property or other assets. Without limiting the generality of the foregoing, each Borrower shall, and shall cause each other Credit Party to, comply with each Environmental Law requiring the performance at any real property by any Borrower or any other Credit Party of activities in response to the release or threatened release of a Hazardous Material.

  • Environmental, Health and Safety Matters (a) The Company has complied and is in compliance with all Environmental, Health, and Safety Requirements.

  • Environment, Health, and Safety (i) The Seller, and its predecessors and Affiliates has complied with all Environmental, Health, and Safety Laws, and no action, suit, proceeding, hearing, investigation, charge, complaint, claim, demand, or notice has been filed or commenced against any of them alleging any failure so to comply. Without limiting the generality of the preceding sentence, each of the Seller, and its predecessors and Affiliates has obtained and been in compliance with all of the terms and conditions of all permits, licenses, and other authorizations which are required under, and has complied with all other limitations, restrictions, conditions, standards, prohibitions, requirements, obligations, schedules, and timetables which are contained in, all Environmental, Health, and Safety Laws.

  • Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location that could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law;

  • Environmental, Health and Safety The Policy Board shall review, approve and monitor environmental and workplace health and safety guidelines, the goal of which is to achieve compliance with current national, state and local laws and regulations regarding environmental and workplace health and safety.

  • Environmental and Safety Matters Except as disclosed in Schedule 4.13:

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Remedial Actions Relating to Hazardous Materials Activities Borrower shall, in compliance with all applicable Environmental Laws, promptly undertake, and shall cause each of its Subsidiaries promptly to undertake, any and all investigations, studies, sampling, testing, abatement, cleanup, removal, remediation or other response actions necessary to remove, remediate, clean up or xxxxx any Hazardous Materials Activity on, under or about any Facility that is in violation of any Environmental Laws or that presents a material risk of giving rise to an Environmental Claim. If Borrower or any of its Subsidiaries undertakes any such action with respect to any Hazardous Materials, Borrower or such Subsidiary shall conduct and complete such action in compliance with all applicable Environmental Laws and in accordance with the policies, orders and directives of all federal, state and local Government Authorities except when, and only to the extent that, Borrower’s or such Subsidiary’s liability with respect to such Hazardous Materials Activity is being diligently contested in good faith and by appropriate proceedings by Borrower or such Subsidiary.

  • Waste and Nuisance The Lessee shall not commit, or suffer to be committed, any waste on the leased premises, nor shall he maintain, commit, or permit the maintenance or commission of any nuisance on the leased premises.

Time is Money Join Law Insider Premium to draft better contracts faster.