REMOVAL OF EXISTING WORK. Hack up/off and remove ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surface for new screed, plaster, tile finish, etc. Breaking up 100mm thick reinforced concrete thick m3 1 Breakdown 110mm brickwall m2 1 Ditto but to 220mm brickwall m2 1 Hack-up plaster work m2 1 Tiles to floors m2 1 Taking out and removing piping, sanitary fittings, etc including disconnecting piping from fittings and making good floor and wall finishes (making good tiling and paintwork elsewhere) Remove wash hand basins plugged to wall No 1 Remove toilet seat fixed to floor complete including cistern No 1 Steel urinal approximately 1000 x 1000mm high, Complete No 1 Taking down and removing roofs, floors, panelling, ceiling Gypsum plasterboard ceilings including cornices, timber brandering,etc m2 1 Take out and remove doors, windows, etc including thresholds. xxxxx, etc and prepare to receive new doors, frames, windows, etc. (all elswhere measured Timber single door, Door lockset including, handles, etc No 1 Taking out and removing glass and mirrors Panes exceeding 0,1m2 and not exceeding 0,5m2 (new glazing elsewhere measured) Item 1 Making good face brickwork Wash down existing face bricks wall with approved soap/acid and pressure hose Item 1 Carried to Final Summary MAINTENANCE OF FLUSHING TOILETS - SCHEDULE OF RATES Description Unit Quantity Rate Amount SECTION B BILL No.1 PLUMBING & DRAINAGE (PROVISIONAL) Class 2 Copper pipes 15mm pipe and fixing to walls etc including any necessary holderbats fixings etc m 1 28mm Ditto m 1 15mm Pipe chased into brickwork m 1 22mm Ditto m 1 28mm Ditto m 1 Extra Over copper pipes for brass compression fittings 15mm fittings No 1 22mm Ditto No 1 28mm Ditto No 1 50mm diameter uPVC pipes with solvent welded straight joints including all excavations not exceeding 1m deep m 1 Ditto but 110mm m 1 Extra Over uPVC pipes for 50mm straightb reducer solvent welded fittings No 1 Ditto but 50mm plain bend No 1 Ditto but 110mm plain bend No 1 Ditto 50mm access bend No 1 Ditto 50mm plain junction No 1 Ditto 110mm plain junction No 1 Ditto but 50mm access junction No 1
AutoNDA by SimpleDocs
REMOVAL OF EXISTING WORK. Taking down and removing roofs, floors, panelling, ceilings, partitions, etc completely 1 Fascia boards and fixings 2 Barge boards and fixings 3 Rainwater gutters and fixings 4 Rainwater downpipes and fixings m 64 m 16
REMOVAL OF EXISTING WORK. NATURE OF WORK: Tenderers are advised to visit the site and to satisfy themselves as to the nature and extent of the work to be done and provide in their tenders any items not specifically mentioned which they may deem necessary for the proper completion of the work. DIMENSIONS The Contractor is advised to take all dimensions affecting the existing buildings on the site, Carried to Collection R Section No. 2 Buildings Bill No. 1 ALTERATIONS
REMOVAL OF EXISTING WORK. Note: Unless otherwise stated, all materials from the alterations and demolitions will belong to the builder. The builder should allow for the removal of all debris from site and keep the site clean at all times
REMOVAL OF EXISTING WORK. Breaking up and removing unreinforced concrete 2 100mm Thick surface bed m3 15 Taking out and removing doors, windows, etc including thresholds, xxxxx, etc from brickwork and building up openings with brick walls including making good face brickwork one side to match existing (New plaster finish and paintwork on other side elsewhere) 3 Single leaf timber door and steel frame unit, size 900 x 2100 mm high overall from one brick wall No 25 Taking down and removing roofs, gutters, etc. 4 Gutters including brackets No 13 5 Roof Sheeting m2 168 Carried Forward R Amount Brought Forward R 6 Rainwater downpipes including brackets m 8 7 Fibre-cement fascia boards size overall 250 x 15 mm thick m 134 8 Barge boards size overall 250 x 15 mm thick m 16 Taking out and removing joinery fittings fixed to walls and floors (Demolition of brick walls and new floors finishes elsewhere) 9 Chalkboard, size1800 mm long and 1200 mm high No 3 Taking down and removing ceilings, partitions, etc m2 126 Taking up and removing floor coverings, wall linings, etc 11 Vinyl floor covering including preparing screed to receive new floor finish m2 126 12 Vinyl skirting 70mm high m 88 Taking out and removing steel security grilles, screens, gates, etc. from brickwork to be demolished 13 Steel security gate to suit door size 813 x 2032 mm high No 13 Taking out and removing glass and mirriors
REMOVAL OF EXISTING WORK. Taking out/off and removing glass 4 Glass from steel windows with beads, including cleaning out rebates and preparing for new glass (new glass measured elsewhere) m2 5 Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
REMOVAL OF EXISTING WORK. Breaking up and removing reinforced concrete 1 150mm Thick surface beds m2 568 2 Steps m3 7 Breaking down and removing brickwork etc
AutoNDA by SimpleDocs
REMOVAL OF EXISTING WORK. Taking up and removing vinyl floor coverings, carpeting, etc: A Remove existing carpet tile floor covering including preparing screed for new vinyl floor tiles (new floor finish elsewhere measured) m² 10 B Remove existing vinyl tile floor covering including preparing screed for new vinyl floor tile (new floor finish elsewhere measured) m² 41 C All existing plinth tiles, where chipped/ cracked, fill with an appropriate cementitious material and make good to match the existing tile aesthetics m² 3
REMOVAL OF EXISTING WORK. Take out and remove electrical units, etc 1 Ceiling fan, including making good finish on ceiling, necessary additional brandering etc. No 8 Carried to Collection R Section No. 2 BUILDING WORKS Bill No. 2 MOPANI SOUTH EAST TVET COLLEGE AIR-CONDITION REPLACEMENT CONDUITS Supply and install listed types of steel / pvc conduits for lights, plugs, power points, etc including joints, bushes, locknuts, cutting bending and threading, placed or chased in concrete floors, walls and ceiling voids 2 20 mm dia SABS marked PVC Conduit m 400
REMOVAL OF EXISTING WORK. Breaking down and removing brickwork, etc 3 One brick wall. m2 91 4 Paving blocks to make way for new storage facility. m2 126 Take out and remove doors, windows, cladding, etc 5 Window size 1100 x 1340mm high. No 28 Taking down and removing roofs, floors, panelling, ceilings, partitions, fencing, etc 6 Softboard ceiling including cornices and brandering. m2 1,686 7 Timber skirting. m 443 Lift up and remove 8 Vinyl floors. m2 1,786 Hack up/off and remove granolithic, screeds, Plaster, etc. from concrete or brickwork and prepare surfaces for new screeds, plaster, etc 9 Internal cement plaster from walls, columns and beams. m2 150 Closing openings, etc 10 One brick wall in building up opening size 1100 x 1340mm through one brick wall and make good including to plaster to two sides. No 28 Carried to Collection R BILL NO.2 : DEMOLITIONS & ALTERATIONS PREPARATORY WORK TO EXISTING SURFACES