Schematic Design (SD) Phase Sample Clauses

Schematic Design (SD) Phase. For the 100% Schematic Design Phase submittal the A/E shall furnish the following deliverables as a Supplement to the SD submittal requirements of Article VI of the Terms and ConditionsAttachment 1 of this Contract and the submittal requirements of the Consultants Procedure Manual:
AutoNDA by SimpleDocs
Schematic Design (SD) Phase. LEWA has included a total of four (4) community/PFRC meetings as follows: one (1) community "kickoff" meeting, one (1) "kickoff" meeting with the County’s Public Facilities Review Committee (PFRC), and two (2) combined Community/PFRC meetings. These meetings will be scheduled as appropriate. XXXX will also review of the cost estimate submitted by the XXXX to ensure project is on budget and is consistent with the design and work of the project. Arlington County, Virginia 1/18/2019‌ Office of the Purchasing Agent 0000 Xxxxxxxxx Xxxxxxxxx, Xxxxx 000 Arlington, Virginia 22201 Fee Clarifications continued:

Related to Schematic Design (SD) Phase

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE