Schematic Progress Printing Sample Clauses

Schematic Progress Printing. The Project Management Contractor shall use commercially reasonable efforts to cause the design consultant to issue a progress printing when the schematic design is approximately 50% complete. The Contractor shall review the progress printing. As part of this review, the Contractor shall (i) confirm adherence to the project’s program and the Final Concept Design; (ii) identify the addition of any items or elements that were not included in the Final Concept Design and/or the deletion of or material change to any items or elements that were not included in the Final Concept Design; (iii) confirm that the design is progressing in a manner that is generally consistent with the design progress meetings; and (iv) confirm that the design consultant is making sufficient progress to meet the approved project schedule. The Project Management Contractor shall prepare a consolidated set of comments incorporating comments from the DGS Project Manager, the Client Agency and the Project Management Contractor and shall submit them to the DGS Project Manager for review and approval. Once the DGS Project Manager approves such comments, the Project Management Contractor shall submit the consolidated comments (the “Schematic Progress Submission Comments”) to the design consultant.
AutoNDA by SimpleDocs

Related to Schematic Progress Printing

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.

  • DRUG/ALCOHOL TESTING 11.1 The parties agree that the maintenance of a drug/alcohol free work place is a goal of both the College and the Union. Employees are prohibited from possession, consumption and/or being under the influence of a controlled substance/alcohol while on the College’s premises or during time paid by the employer. Violations of this prohibition may result in a disciplinary action up to and including termination.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

Time is Money Join Law Insider Premium to draft better contracts faster.