Shooting Lanes Sample Clauses

Shooting Lanes. The shooting lanes shall be 50 yards minimum length from the bullet trap and 54” minimum, unobstructed width. All range lanes shall be equipped with overhead, 360-degree turning targets with tablet controls mounted near the Range main entry door. Range shall also be equipped with a dual running-man target system with adjustable speeds. Baffle system shall be designed to mitigate noise and to keep errant rounds contained within the range, preventing damage to the structure of the building. Sound abatement design shall limit the firing reverberation time to less than 1.5 seconds or better. Minimum Size: 4,500 SF; Walls: Ballistic construction with acoustical rated wall covering; Ceiling: Open to Structure, ballistic construction with acoustically rated baffles angled toward bullet trap; Floor: Finished Concrete with stained concrete shooting line and lane identification numbers; Openings: None or minimal requirement by AHJ; Electrical/LV: LED Light, Vacancy Sensor Switches. All electrical to be vapor proof fixtures. Low Voltage for target systems control panel and wall mounted phone;
AutoNDA by SimpleDocs

Related to Shooting Lanes

  • Troubleshooting Please contact our tech support 24/7 for service issues at 0 (000) 000-0000 relating to internet and telephone.

  • Helpdesk Customers must contact LightEdge Support to report service trouble or an outage with LightEdge Technical Support. LightEdge Technical Support will be available seven (7) days per week; twenty-four (24) hours per day; three hundred sixty-five days (365) days per year. LightEdge Technical Support provides support for network monitoring, trouble ticket resolution, and fault isolation up to the termination point of LightEdge provided Equipment. LightEdge Technical Support will accept trouble and outage related support calls from any customer representative. LightEdge will not perform any requested activity which may cause Service disruption or perform any changes to Service unless request is initiated by an Authorized Contact. LightEdge reserves the right to delay response on support tickets opened by anyone other than the Authorized Contact. Communication between Customer and LightEdge not initiated by Authorized Contact will not be subject to SLA remedies. All communications with Customer will be in the English language.

  • Traffic Management The Customer will not utilize the Services in a manner which, in the view of the Centre Operator, significantly distorts traffic balance on the Centre Operator’s circuits which are shared with other users. If, in the reasonable view of the Centre Operator, the Customer’s traffic patterns cause or may cause such distortion, the Customer should have a dedicated circuit capability. If the Customer declines to do so then the Centre Operator may suspend the Services while the matter is being resolved. If there is no resolution within 5 business days then either party may terminate the Agreement.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Help Desk A help desk for Product support issues (the “Help Desk”) will be available to Customer. Unless specified in an Order, Customer should contact 000.000.0000 to receive a telephone number for the applicable supporting Solutions & Support Center. Customer will appoint one Product administrator and one backup administrator to serve as the primary point of contact regarding maintenance services.

  • Classroom Management The certificated classroom teacher demonstrates in his/her performance a competent level of knowledge and skill in organizing the physical and human elements in the educational setting.

  • Debriefing If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

Time is Money Join Law Insider Premium to draft better contracts faster.