Software Development Cycle Sample Clauses

Software Development Cycle. (i) The software development cycle is approximately 3 months from the signing date of this Contract.
Software Development Cycle. (i) The software development cycle is approximately 2 months from the signing date of this Contract. The time frame encompasses activities such as requirements research, requirements analysis, architecture design, software development, testing, implementation and deployment, as well as training. (ii) Party B shall submit to Party A in advance the first draft of documents and information needing to be reviewed and confirmed by Party A during the development process. Upon receiving the first draft, Party A shall reply in writing in a timely manner to Party B to reply the review comments. With respect to any rectification suggested by Party A, Party B shall review and make the rectification in a timely manner and submit it to Party A again for review. If Party A makes no reply within 5 working days since receiving the first draft, it shall be considered that Party A has reviewed and confirmed the first draft. Party A’s signature approval of various process documents and information only represents the review of the applicability, demand, usability and feasibility of the developed software, and Party A does not review the technical issues therein. In case of any technical issues or technical adjustments related to Party B’s design after the confirmation by Party A, Party B shall actively cooperate with the adjustments.
Software Development Cycle. 1) The first part of the software development cycle is approximately 1 month, calculated from the date of signing this contract.

Related to Software Development Cycle

  • Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Program Development NWESD agrees that priority in the development of new applications services by XXXXX shall be in accordance with the expressed direction of the XXXXX Board of Directors operating under their bylaws.

  • Manufacturing Technology Transfer Except as the Committee ------------ --------------------------------- may otherwise agree in writing, in order to effectuate an orderly transition of the uninterrupted availability of Product to LILLY for purposes contemplated under this Agreement, MEGABIOS, at least ninety (90) days prior to completion of the Project or completion of Phase I Clinical Trials, whichever is earlier, shall transfer to LILLY all information and instructions concerning the manufacturing process and related matters in MEGABIOS' possession which may be necessary for LILLY to manufacture Product (including information regarding obtaining necessary Lipids related thereto) for clinical trials and commercialization as contemplated hereunder including, but not limited to, analytical and manufacturing methods. MEGABIOS shall also provide assistance (in the form of consultation) to LILLY with respect to manufacturing matters for a period of [ * ] months after completion of the initial transfer of information and instructions as provided below. Such transfer and assistance by MEGABIOS will be referred to herein as the "Manufacturing Transfer." All such information, methods and instructions transferred to LILLY under this Section 4.3 shall be referred to herein as the "Manufacturing Information," and shall be maintained in confidence by LILLY pursuant to Section 7.1, except that LILLY's obligation to maintain in confidence such Manufacturing Information shall survive for ten (10) years following expiration or termination of this Agreement. LILLY agrees that it will use all such transferred Manufacturing Information only for the manufacture of the Products and shall not disclose or transfer such Manufacturing Information to any third party manufacturer except as provided in Section 2.10. MEGABIOS shall provide, and bear its costs for, up to [ * ] FTEs for a period of up to [ * ] months [ * ] in aggregate) to accomplish the Manufacturing Transfer. Such FTEs, at LILLY's request, shall include visits to LILLY's facilities by MEGABIOS personnel including up to [ * ] from MEGABIOS' head of manufacturing. MEGABIOS shall furnish any additional reasonable assistance beyond the assistance described above regarding manufacturing matters that LILLY may request and that MEGABIOS is able to provide, for up to [ * ] after the initial transfer of Manufacturing Information, providing that LILLY [ * ] incurred with respect to such additional assistance.

  • Technology Research Analyst Job# 1810 General Characteristics

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Support Services Rehabilitation, counselling and EAP’s. Support is strictly non- punitive, and can be accessed at anytime (self-identification of the need for help is strongly encouraged).

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.