Storm Water Drainage System Sample Clauses

Storm Water Drainage System. GPCL will lay and maintain the main drains along the main road, or as proposed in the master plan to which Solar power developers may connect their internal plant drains. Major streams are suggested to be channelized by developers as tentatively indicated in the plot plan & obtain necessary approvals from GPCL for maintaining continuity in existing streams at the boundary of individual plots.
AutoNDA by SimpleDocs
Storm Water Drainage System. The storm water drainage system located throughout the Project and all equipment related thereto, except to the extent set forth in Section 4 of this Article.
Storm Water Drainage System. The Concessionaire shall design and implement the storm water drainage system within the Waste Processing Facility in such a manner as to ensure that (a) it is independent from the Leachate System (as provided in Clause 3.4 below); (b) the run-off rain water from the hinterland does not enter the Municipal Solid Waste storage and processing area;
Storm Water Drainage System. The Concessionaire shall design and implement the storm water drainage system within the Waste Processing Facilities in such a manner as to ensure that (a) it is independent from the Leachate System; (b) the run-off rainwater from the hinterland does not enter the Municipal Solid Waste storage and processing area; (c) there is no stagnation of rainwater in the Sites. The drainage system shall be constructed so as to meet the minimum technical specifications given below. Parameter Specifications Design  Shall have rectangular cross section  Shall be neat cement plastered Parameter Specifications  Shall be as per the Drawings approved by the IAA/PMC/ULB/Engineering Wing.
Storm Water Drainage System. (a) The Concessionaire shall design and implement a storm water drainage system within the Landfill Facility in such a manner as to ensure that (i) it is independent from the Leachate System; (ii) the run-off rain water from the hinterland does not enter the Municipal Solid Waste storage and processing area; (iii) there is no stagnation of rain water in the Site. (b) The drainage system shall be constructed so as to meet the minimum technical specifications set out in Table 2.3 of Schedule D.
Storm Water Drainage System. Each Lot Owner shall be financially responsible to and shall maintain grass cover, mow and clean and maintain in a good condition any part of the storm water drainage system located within such Owner’s respective lot and to maintain natural xxxxxx free from obstruction and to comply with any applicable drainage ordinances. The drainage facilities within the Subdivision include easements, xxxxxx, storm sewers and a retention area or lake. In the event that a public agency requires improvements to the storm sewer system and/or the retention area or lake which are a portion of the storm water drainage system that serves the lots within the Subdivision, all of the Owners of the lots within the Subdivision shall contribute a proportionate share of the cost of repair to such storm sewer system. If any Owner(s) of any Lot(s) shall fail to pay such proportionate share within thirty (30) days of receipt of notification, any other Owner of a lot within the Subdivision shall be authorized to file a lien upon any lot(s) owned by any nonpaying Owner(s).
Storm Water Drainage System. All storm water drainage and filtration facilities, if any, serving the Project.
AutoNDA by SimpleDocs
Storm Water Drainage System. The Storm Water Drainage System including the Storm Water Retention Area and other drainage areas and apparatus depicted as such on the Condominium Subdivision Plan.
Storm Water Drainage System a Roofs will be drained by gravity through roof drains and inside downspouts, and connect to the site storm water drainage system. .b A separate overflow drainage system will be provided that will spill to grade, or through curb faces, as required.
Storm Water Drainage System. GIPCL will lay and maintain the main drains along the main road, or as proposed in the master plan to which Solar power developers (SPD) may connect their internal plant drains. If the level of SPDs drain is lower than Park drain then suitable pumping arrangement shall be made by SPD to drain the plant water in the park drain at the GIPCL approved point. Major streams are suggested to be channelized by developers as tentatively indicated in the plot plan & obtain necessary approvals from GIPCL for maintaining continuity in existing streams at the boundary of individual plots.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!