Submission at Final Design Review Sample Clauses

Submission at Final Design Review. The Contractor shall submit at the time of the Final Design Review a Recommended Spare Parts List for the equipment to be furnished. The list shall be created using the Contractor’s Xxxx of Materials and shall be updated as the equipment design and assembly progresses. All items in the Recommended Spare Parts List shall be referenced in the Illustrated Parts Catalogue. The Recommended Spare Parts List shall be based on the Contractor’s experience with similar equipment in service on other properties and the Authority’s operating conditions and performance of preventive maintenance.
AutoNDA by SimpleDocs

Related to Submission at Final Design Review

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Design Review At appropriate stages of design, documented reviews of the design results shall be planned and conducted. Participants at each Design Review shall include representatives of all functions concerned with the design stage being reviewed, as well as other specialist personnel, as required. Records of such reviews shall be maintained. Any computer software used to perform alternative calculations or verify clearances through the use of scale models or computer-aided design and drafting (CADD) techniques shall be validated before the use of the application, with validation documented in accordance with Section 2.2.15. In addition, at each submittal to IFA for review, Developer shall provide hand calculations that validate any calculations performed by computer software.

  • Commencement of Final Design This contract does not obligate the State to proceed with final design for any alternative. On completion of environmental documentation, the State will consider all reasonable alternatives in a fair and objective manner. Notwithstanding anything contained elsewhere in the contract or in any work authorization, the Engineer may not proceed with final design until after all relevant environmental decision documents have been issued.

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • Transition Review Period In accordance with Article 35, Layoff and Recall, the Employer may require an employee to complete a transition review period.

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum.

  • Final Certificate, Design Professional’s Certificate of Final Completion The Certificate issued by the Design Professional stating that all work has been completed in accordance with the terms of the Contract Documents. See Section 6,

  • Public Posting of Approved Users’ Research Use Statement The PI agrees that information about themselves and the approved research use will be posted publicly on the dbGaP website. The information includes the PI’s name and Requester, project name, Research Use Statement, and a Non-Technical Summary of the Research Use Statement. In addition, and if applicable, this information may include the Cloud Computing Use Statement and name of the CSP or PCS. Citations of publications resulting from the use of controlled-access datasets obtained through this DAR may also be posted on the dbGaP website.

  • Validation Review In the event OIG has reason to believe that: (a) Good Shepherd’s Claims Review fails to conform to the requirements of this CIA; or (b) the IRO’s findings or Claims Review results are inaccurate, OIG may, at its sole discretion, conduct its own review to determine whether the Claims Review complied with the requirements of the CIA and/or the findings or Claims Review results are inaccurate (Validation Review). Good Shepherd shall pay for the reasonable cost of any such review performed by OIG or any of its designated agents. Any Validation Review of Reports submitted as part of Good Shepherd’s final Annual Report shall be initiated no later than one year after Good Shepherd’s final submission (as described in Section II) is received by OIG. Prior to initiating a Validation Review, OIG shall notify Good Shepherd of its intent to do so and provide a written explanation of why OIG believes such a review is necessary. To resolve any concerns raised by OIG, Good Shepherd may request a meeting with OIG to: (a) discuss the results of any Claims Review submissions or findings; (b) present any additional information to clarify the results of the Claims Review or to correct the inaccuracy of the Claims Review; and/or (c) propose alternatives to the proposed Validation Review. Good Shepherd agrees to provide any additional information as may be requested by OIG under this Section III.D.3 in an expedited manner. OIG will attempt in good faith to resolve any Claims Review issues with Good Shepherd prior to conducting a Validation Review. However, the final determination as to whether or not to proceed with a Validation Review shall be made at the sole discretion of OIG.

Time is Money Join Law Insider Premium to draft better contracts faster.