Submittal Format. 7 Submittal packages must have a unique alphanumeric identifier that remains with the package 8 and identifies each Submittal stage (e.g., Initial Design Submittal, Final Design Submittal, RFC
Submittal Format. 19 Submittal packages must have a unique alphanumeric identifier that remains with the package 20 and identifies each Submittal stage (e.g., Initial Design Submittal, Final Design Submittal, RFC
Submittal Format. 3 Submittal packages must have a unique alphanumeric identifier that remains with the package 4 and identifies each Submittal stage (e.g., Initial Design Submittal, Final Design Submittal, RFC
Submittal Format. ALL bid copies must be submitted in a sealed envelope or container with the OUTERMOST Container stating the address, telephone number, the RFPP number and title RFPP #24003 0000 Xxx Xxxx Drive Hanger Lease If you have an ACCGov Vendor Number please include it on the sealed envelope or container. If you do not know your vendor number, please email: xxxxxx@xxxxxx.xxx. If you do not have a vendor number but you are awarded this RFP, you will be invited to submit your vendor registration per the following instructions: xxxxx://xxx.xxxxxx.xxx/DocumentCenter/View/88465.
Submittal Format. Conceptual Design-Submittal shall be one (1) full size drawing set of 22”x34” plans and PDF format.
Submittal Format. Design-Submittal No. 3 shall be one (1) full size drawing set of 22”x34” plans and PDF format.
Submittal Format. Construction Document-Submittal Nos. 4a, 4b, 5a, 5b and 5c shall be submitted on. 22”x 34” for plans and 8.5”x11” double sided for Technical Specifications Manual. Bond prints of all plans will be included with each Submittal.
Submittal Format. 19 Submittal packages must have a unique alphanumeric identifier that remains with the package 20 and identifies each Submittal stage (e.g., Initial Design Submittal, Final Design Submittal, 21 Release for Construction Submittal, etc.). The alphanumeric identifier must remain constant and 22 track the design package through the life of the Project. 23 Developer shall submit all Submittal documents in hardcopy and electronic format as specified 24 in Table 110-12 unless otherwise specified in the Contract Documents. Administrative Documents (e.g., PMP, Project Schedule) X X X Specifications, Technical Reports, Calculations, Modeling, Input and Output Files, etc. X X X Initial Design Submittal X X X Final Design Submittal X X X Release for Construction Submittal X X X Final Design Documents Submittal X X X Shop and Working Drawings X X Request for Information X Design Changes X X Record Drawings X X X Other Governmental Entities, Utility Companies, and railroad submittals* X Note: * Developer shall determine the additional format requirements required by the applicable Governmental Entity, Utility Company, and/or railroad.
Submittal Format a. Submit Drawings in both electronic (AutoCad) and hard copy form.
b. Submit cut sheets, calculations, etc. in electronic PDF format and in hard copy form.
Submittal Format. Design-Submittal Nos. 1a and 1b shall be submitted on min. 11”x17” and max. 30”x 42” for plans and 8.5”x11” double sided for outline specifications/reports.