Final Design Submittal Sample Clauses

Final Design Submittal. ‌ 8 When the design for a given element or area is approximately 95 percent complete, Developer 9 shall prepare and submit a Final Design Submittal to ADOT for review and comment. Each Final 10 Design Submittal must include Plans, specifications, technical memorandums, reports, studies, 11 calculations, and other pertinent data, as applicable. The Final Design Submittal must also 12 include a Comment Resolution Form showing how the Final Design Submittal addresses the 13 review comments generated during the previous Submittal reviews.
AutoNDA by SimpleDocs
Final Design Submittal. The Consultant shall: • Address all final review comments in a matrix format and incorporate applicable comments pursuant to the City’s 100% review into the final plans, special provisions, bid schedule and cost estimates. • Furnish to the City copies of all Project drawings in AutoCAD format and of all Project Contract Documents in Microsoft Word format on CD-media or USB flash drive. • Provide one set of final, sealed, full-size original bond drawings with mylar cover sheet (signed by the appropriate public agencies and utility companies), Special Provisions, and Geotechnical Report, in a form approved by the City and suitable for reproduction. • Provide Project probable opinion of construction cost broken out by funding source. • Provide calculations, design worksheets, and other information for the City’s files. • Provide through its geotechnical subconsultant, a Technical Memorandum to the City summarizing the review of the final plans and specifications for conformance to the recommendations in the Geotechnical Report.
Final Design Submittal. Design is fully complete in all aspects and considered at final design and bid-ready. Design Consultant shall incorporate City review comments from the 100% Submittal. The Design Consultant shall submit the Final Design and Specifications for cursory review. All Design Consultant’s in-house review comments and all City review comments are addressed and all disagreements and open issues are resolved prior to submittal of these documents to the CIP Project Manager. FINAL DESIGN DELIVERABLES (Approximately 51 sheets)
Final Design Submittal. The PSQAM shall submit to TxDOT the Final Design Submittal for review along with a certification of compliance with each Submittal. Construction packages for individual Work items, Elements or phases shall be organized such that the final document package can be assembled in a manner similar to the standard construction documentation typically provided to TxDOT for conventional project letting, as mutually agreed upon by Developer and TxDOT. When Xxxxxxxxx has completed the Final Design Submittal for an item, Element, or phase and seeks to obtain TxDOT’s concurrence of such a design, as further described in Section 2.2.7.7, the PSQAM shall certify that:
Final Design Submittal. The CONSULTANT shall: • Address all final review comments and incorporate applicable comments pursuant to the CITY’s 100% review into the final Plans, Special Provisions, bid schedule, and cost estimate. • It is assumed that the project will be designed in two phases such that separate plan sets for the 1) block wall and for 2) onsite improvements will be prepared. The wall plan set is expected to only generate one (1) set of comments while the onsite improvement plans may generate up to three (3) sets of comments across
Final Design Submittal. The CONSULTANT shall: • Address all final review comments in a matrix format and incorporate applicable comments pursuant to the CITY’s 100% review into the final plans, special provisions and bid schedule. • Provide one special provision package that will accompany both of the two improvement plan sets. Special Provisions page footers will be unique for each bid package. • Furnish to the CITY copies of all PROJECT drawings in AutoCAD format and of all PROJECT Contract Documents in Microsoft Word format on CD-media. • Provide one set of final, sealed, full-size original bond drawings with mylar cover sheet (signed by the appropriate public agencies and utility companies) and Special Provisions, and Geotechnical Evaluation, in a form approved by the CITY and suitable for reproduction. • Provide PROJECT probable opinion of construction cost for the two bid packages broken out by funding source. • Provide calculations, design worksheets, and other information for the CITY’s files. • Provide through its geotechnical subconsultant, a Technical Memorandum to the CITY summarizing the review of the final plans and specifications for conformance to the recommendations in the Geotechnical Evaluation.
Final Design Submittal. ‌ Contractor shall provide a detailed final design submittal within three (3) months of the Notice to Proceed. This submittal shall be reviewed with MTD to verify that all aspects of Contractor’s design are in conformance with the specifications. The final design submittal shall include a complete description of each AIM system and system component, updates to the technical information submitted in the preliminary design submittal, and an updated detailed project schedule. At a minimum, the overview shall provide details of each system and discuss any changes and updates that have been made since the preliminary design submittal.
AutoNDA by SimpleDocs
Final Design Submittal. The FIRM will prepare a 100% final design submittal based on the comments received at the 90% review meeting with the City and any revisions made during bidding for a conformed set. FIRM will provide review of the final shop drawings based on these final design documents. The technical specifications and drawings will then be submitted to the City and/or WS.
Final Design Submittal. Bid Contract Documents A single final percent design review package should be created to combine each of the work order initiated Pedestrian corridors. The review package should be organized by engineering design discipline (Civil, Architectural, Structural, Mechanical, etc.). Final percent drawings shall incorporate comments and changes as a result of 95 percent design review meeting. These submittals of final percent drawings are to be essentially complete and suitable for the City construction bidding. Final percent design shall be prepared in conformance to section 3 of City of Bend Design Standards. Consultant shall provide a complete set of technical documents (bid schedule, special specifications and special provisions) for review. The technical documents shall include a unit price bid format breakdown and division of specifications. The City of Bend shall provide a template document for specification, provisions and bid schedule formats. The consultant shall review all technical documents and make appropriate edits. The City of Bend will create a project specific bid document. Deliverables: • Provide five bound copies of the Final Design Review package. • Five bound sets of Final drawings, 11-inch x 17-inch. • Project Cost estimate. • Project schedule. • Agenda and minutes for City review meeting from QA/QC comments on 95 percent Design Review package. • Provide an updated Bid Schedule in MS Excel format. (An example of the City’s excel worksheet will be provided). • PDF’s of all of the deliverables stated above in a CD
Final Design Submittal. The Consultant shall: • Address and incorporate all final review comments received during the 100% Design Review meeting in to plans, contract documents and cost estimate. • Provide the special conditions, Special Provisions, and Appendices for insertion into the Contract Documents. • Provide final drawings signed/approved by the appropriate public agencies and utility companies. • Ensure that all drawings, special provisions, and reports have been sealed, signed and dated by a Professional Engineer(s) licensed in the state of Nevada.