Tanks and Pressure Vessels Sample Clauses

Tanks and Pressure Vessels. All Facility tanks and pressure vessels will have sufficient storage capacity to meet the requirements of the particular system application. Tanks and pressure vessels shall be fabricated from materials suited to the particular service. A corrosion allowance shall be incorporated into the Design such that the tanks will have a design life of 35 years. Tanks will be provided with overflow connections and piping where required. Overflow connections and piping will be one pipe size larger than the largest input line or combination of input lines than can discharge into the tank simultaneously. Maintenance drain connections and piping will be provided of an adequate size to allow drainage of the tank in a reasonable time period. Manholes on tanks and pressure vessels, where provided, will be a minimum of 18 inches in diameter. Exterior access ladders and cleanout doors will be provided on large tanks.
AutoNDA by SimpleDocs

Related to Tanks and Pressure Vessels

  • Vessels Each Vessel is

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Plant and Equipment The plants, structures and ------------------- equipment of the Company are structurally sound with no known defects and are in good operating condition and repair and are adequate for the uses to which they are being put. None of such plants, structures or equipment are in need of maintenance or repairs except for ordinary, routine maintenance and repairs which are not material in nature or cost. The Company has not received notification that it is in violation of any applicable building, zoning, anti- pollution, health or other law, ordinance or regulation in respect of its plants or structures or their operations.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.