Temperature of Concrete. Temperature of concrete as placed, critical to cracking control and durability, shall, preferably not exceed about 32.20 C (900 F). Accordingly, placement of concrete in hot weather shall be done during the morning and evening hours, extending to night hours as required. For work in extreme weather conditions, the procedure set out in IS 7861 (Part- 10 or IS 7861 (Part-2) be broadly followed.
AutoNDA by SimpleDocs
Temperature of Concrete. Fresh structural concrete and fresh canal lining concrete shall be placed at temperature of between 15 0C to 32 0C. During Hot or cold weather, the concreting should be done as per the procedure set in L.S. 7861 (Part – I – 1975 or I.S. 7861 (Part – II)). Temperature will be determined by placing a thermometer in the concrete immediately after sampling at the site of placement. The temperature of concrete at the batch plant shall be adjusted to assure that the specified concerted temperature is attained at the placement. In case of concrete in hot weather condition, the contractor shall employ effective means as precooling of aggregates and sprinkling water on aggregate piles and placing the concrete at night, as necessary to maintain the temperature of the concrete as it is placed at the specified transmit. The methods of precooling shall be subject to approval by the Engineer-in-Charge. The contractor shall not be entitled for any additional compensation due to the foregoing requirements.
Temperature of Concrete. The temperature of concrete when it is being placed shall be not more than 90 degrees F nor less than 40 degrees F in moderate weather, and not less than 50 degrees F in weather during which the mean daily temperature drops below 40 degrees F. Concrete ingredients shall not be heated to a temperature higher than that necessary to keep the temperature of the mixed concrete, as placed, from falling below the required minimum temperature. If concrete is placed when the weather is such that the temperature of the concrete would exceed 90 degrees F, the CONTRACTOR shall employ effective means, such as precooling of aggregates and mixing water, using ice, or placing at night, as necessary to maintain the temperature of the concrete, as it is placed, below 90 degrees F. The CONTRACTOR shall be entitled to no additional compensation on account of the foregoing requirements.

Related to Temperature of Concrete

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Network Congestion Reduced Speed for Routing or Answering 911 Dialing Calls. There may be a greater possibility of network congestion and/or reduced speed in the routing of a 911 Dialing call made utilizing the Service as compared to traditional 911 dialing over traditional public telephone networks.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Reactivation To reactivate suspended Service, you must bring your account current through the month of reactivation by making payment in full of any outstanding balance, fees and other applicable charges. In addition, we may require a deposit before reactivating your Service. The amount of the deposit will not exceed one year of monthly fees. Any amounts deposited by you will appear on your statement as a credit, and service charges and other fees will be invoiced as described above. If you fail to pay any amount on a subsequent xxxx, the unpaid amount will be deducted each billing cycle from the credit amount. Credit amounts will not earn or accrue interest.