Template Control Sample Clauses

Template Control. Maintain a current copy of each Subscriber Unit and template used on Agency-specific consoles operating on the RCS. Each RCS Party and Associate is responsible for updating its respective templates and providing said copies to the Program Manager/Xxxxxxxxxx County. The Program Manager/Xxxxxxxxxx County shall make templates available to all RCS Parties and Associates upon request. The Program Manager/Xxxxxxxxxx County shall also maintain a copy of all Template Interlocal Agreements, Memorandums of Understanding, and written agreements between RCS Parties, Associates, and other agencies authorizing the sharing, programming, and usage of any channels on the RCS. The Program Manager/Xxxxxxxxxx County will coordinate subscriber unit templates and fleet mapping to ensure that interoperability requirements are met between all users of the RCS and the City of Austin Regional Radio System;
AutoNDA by SimpleDocs

Related to Template Control

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Climate Control a. The air conditioning/heating units shall be functional at all times.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Separate Contractor Any person or entity other than Contractor that enters into an agreement with Owner to perform the construction of all or any portion of the construction on a Project.

  • Reasonable Suspicion Testing The Employer may, but does not have a legal duty to, request or require an employee to undergo drug and alcohol testing if the Employer or any supervisor of the employee has a reasonable suspicion (a belief based on specific facts and rational inferences drawn from those facts) related to the performance of the job that the employee:

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Business Continuity and Disaster Recovery Bank shall maintain and update from time to time business continuation and disaster recovery procedures with respect to its global custody business, which are designed, in the event of a significant business disruption affecting Bank, to be sufficient to enable Bank to resume and continue to perform its duties and obligations under this Agreement without undue delay or disruption. Bank shall test the operability of such procedures at least annually. Bank shall enter into and shall maintain in effect at all times during the term of this Agreement reasonable provision for (i) periodic back-up of the computer files and data with respect to Customer and (ii) use of alternative electronic data processing equipment to provide services under this Agreement. Upon reasonable request, Bank shall discuss with Customer any business continuation and disaster recovery procedures of Bank. Bank represents that its business continuation and disaster recovery procedures are appropriate for its business as a global custodian to investment companies registered under the 1940 Act.

Time is Money Join Law Insider Premium to draft better contracts faster.