Toll System Oversight Sample Clauses

Toll System Oversight. This work specifically addresses support of the express lanes TOLL SYSTEM. It includes: TOLL SYSTEM strategic advice, TSI management, final design and project controls support for TSI activities.
AutoNDA by SimpleDocs
Toll System Oversight. This task covers the continued scope of Task 1.1.2 through TOLL SYSTEM testing and installation.
Toll System Oversight. This work specifically addresses support of the express lanes TOLL SYSTEM. It includes: TOLL SYSTEM strategic advice, TSI management, final design and project controls support for TSI activities. Strategic Advice This task covers, as-needed, technical and strategic advice to support SMCJPA with the planning and design of express lanes. Strategic advice may take the form of proactive or reactive advice – proactive advice shall be in the form of recommendations of concepts and implementation techniques and reactive advice shall be in response to issues raised by SMCJPA. Design This work includes verification of toll system requirements and applicability to the 101 Corridor, design review, and validation for the addition of new express lane segments and TOLL SYSTEM enhancements for both HOST and ROADSIDE SYSTEM. It includes review of TSI’s requirements traceability matrix for thoroughness and accuracy. TSI Controls

Related to Toll System Oversight

  • System Operations Each party, at its own expense, shall provide and maintain the equipment, software, services and testing necessary to transmit Data Communications to, and receive Data Communications from the parties’ respective Receipt Computers.

  • SYSTEM OPERATION The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

  • Project Oversight Inspection and acceptance of the Work shall be performed by Xxxxxxx Xxxxxxx, Project Manager of the Planning, Development & Facilities Department of the District. The architect for the Project is (N/A to this project) (“Architect”), and the Project Manager on the Project is Xxxxxxx Xxxxxxx, (“Project Manager”)

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.