Traffic Operations Alternatives Analysis Sample Clauses

Traffic Operations Alternatives Analysis. Consultant shall prepare a traffic analysis to support the City’s selection of intersection control for the Project. Alternatives to be considered are identified above. Capacity analysis must be based on current Highway Capacity Manual (“HCM”) methodology.  Utilize 2017 existing traffic counts from City’s TSP Update  Utilize 2031 traffic volumes prepared for the St. Helens’ TSP Update, with and a without the Riverfront Connector  Conduct stop control warrant analysis based on MUTCD methodology & current count data  Summarize traffic operations analysis in technical memorandum to be incorporated into combined Alternatives Analysis Report (see Task 2.5)
AutoNDA by SimpleDocs

Related to Traffic Operations Alternatives Analysis

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Preventive Care and Early Detection Services This plan covers, early detection services, preventive care services, and immunizations or vaccinations in accordance with state and federal law, including the Affordable Care Act (ACA), as set forth below and in accordance with the guidelines of the following resources: • services that have an A or B rating in the current recommendations of the U.S. Preventative Services Task Force (USPSTF); • immunizations recommended by the Advisory Committee on Immunization Practices of the Centers for Disease Control and Prevention; • preventive care and screenings for infants, children, and adolescents as outlined in the comprehensive guidelines supported by the Health Resources and Services Administration (HRSA); or • preventive care and screenings for women as outlined in the comprehensive guidelines as supported by HRSA. Covered early detection services, preventive care services and adult and pediatric immunizations or vaccinations are based on the most currently available guidelines and are subject to change. The amount you pay for preventive services will be different from the amount you pay for diagnostic procedures and non-preventive services. See the Summary of Medical Benefits and the Summary of Pharmacy Benefits for more information about the amount you pay. Preventive Office Visits This plan covers the following preventive office visits. • Annual preventive visit - one (1) routine physical examination per plan year per member age 36 months and older; • Pediatric preventive office and clinic visits from birth to 35 months - 11 visits; • Well Woman annual preventive visit - one (1) routine gynecological examination per plan year per female member.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Quality Management Grantee will:

Time is Money Join Law Insider Premium to draft better contracts faster.