Transportation Design Subtask 7 Sample Clauses

Transportation Design Subtask 7. 4.1 Roadway design This task includes the following:‌  Redesign of Newport Avenue will be based on the design elements as outlined in the Design Criteria developed during subtask 4.4.  Refine alignment and grade of Newport Avenue based on the review comments received during preliminary design development and in subsequent design reviews.  Redesign of the splitter islands, center truck apron and curb lines of the roundabouts, at the intersections of 00xx Xxxxxx and 9th Street, as recommended in subtask 4.4. Reconstruction within the College Way RAB will be limited to areas impacted through utility improvements.  Reconstruction of the pavement of the roundabouts at the intersections of 00xx Xxxxxx and 9th Street, with concrete or asphalt as recommended in subtask 3.4. Pavement reconstruction within the College Way RAB will be limited to areas impacted through utility improvements.  Develop side streets, alignment, and grade. This shall include investigating adjustments in the cross slopes of Newport Avenue to limit the impacts on the side streets. Develop templates and process the catch points for grading on Newport Avenue. Refine the side street alignment and grade, making final adjustments to minimize the impacts on the side streets. Revise the model to reflect the changes made in the plan and profile.  Review the grading catch points for impact to right-of-way and make refinements to the model or adjustments to the catch treatment in order to minimize impacts to the adjacent properties. Make final adjustments to the model and the catch treatment to finalize the right-of-way and easement needs, including consideration of sight distance.  Plot roadway cross-sections at 20-foot intervals, at driveways, at side street centerlines and appropriate grade breaks.  Design and model driveway approaches and connections. Verify intersection sight lines are clear of obstructions. Develop driveway construction tables.  Identify driveways requiring detail sheets and develop detail sheets for those driveways.  Develop plan and profile sheets.  Develop intersection grid details showing proposed surface elevations for intersections  Coordinate with Cascade East Transit (CET) on design elements for transit stops, basic (sign and concrete pad) or enhanced (sign, concrete pad and accommodation for shelter) at the following locations : o Newport/11th north and south o Newport/14th, north and south o Newport/College Way, north and south  Develop up to two (2) conce...
AutoNDA by SimpleDocs

Related to Transportation Design Subtask 7

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Work Loads If an employee believes the amount of work he or she is required to perform is excessive over what is required from the rest of the staff and it will result in an occupational accident or occupational injury to him or her, the question shall be referred to Section 17 of this Agreement.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!