Underground Injection Control Program Sample Clauses

Underground Injection Control Program. The resources available to the Illinois EPA for the administration of the Underground Injection Control Program remain insufficient to fully address all aspects of the program. As a result, the measures listed below will be implemented to the extent resources allow. The work of the UIC program supports the USEPA national goal of "Clean and Safe Water" and USEPA Region 5, Water Division Goal of "All people in Region 5 served by public water supplies have water that is consistently safe to drink." The main objective of the UIC program is to protect USDWs from contamination as the result of underground disposal of waste fluids through injection xxxxx. To this end, Illinois EPA will meet or exceed national performance activity measures as established for the UIC program.
AutoNDA by SimpleDocs
Underground Injection Control Program. The main objective of the UIC program is to prevent contamination of underground sources of drinking water. The work of the UIC program supports the USEPA national goal of "Clean and Safe Water" and USEPA Region 5, Water Division Goal of "All people in Region 5 served by public water supplies have water that is consistently safe to drink." The specific goal of the UIC program is to protect underground sources of drinking water from contamination by underground disposal of hazardous and non-hazardous waste through injection xxxxx. To this end, Illinois EPA will meet or exceed national performance activity measures as established for the UIC program.

Related to Underground Injection Control Program

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!