Voltage Fluctuation Sample Clauses

Voltage Fluctuation. The process of starting a Facility can sometimes cause step changes in voltage levels in the distribution network. These step changes are caused by inrush currents, which may occur when transformers or induction generators are energised from the network. Step voltage changes will also occur whenever a loaded generator is suddenly disconnected from the network due to faults or other occurrences. Step voltage changes caused by the connection and disconnection of the Facility shall not exceed +/- 3% for infrequent planned switching events or outages and +/-6% of the nominal voltage of 22kV for unplanned outages such as faults.
AutoNDA by SimpleDocs

Related to Voltage Fluctuation

  • Uncontrollable Forces 12.1 Section 14.1 of the CAISO Tariff shall be incorporated by reference into this Agreement except that all references in Section 14.1 of the CAISO Tariff to Market Participants shall be read as a reference to the Scheduling Coordinator and references to the CAISO Tariff shall be read as references to this Agreement.

  • Leadwork Differential (a) Leadwork differential shall be defined as a differential for employees who have been formally assigned by their supervisor in writing, “leadwork” duties for ten (10) consecutive calendar days (or the equivalent thereof for alternate or flexible schedules) or longer provided the leadwork or team leader duties are not included in the classification specification for the employee’s position. Leadwork is where, on a recurring daily basis, the employee has been directed to perform substantially all of the following functions: to orient new employees, if appropriate; assign and reassign tasks to accomplish prescribed work efficiently; give direction to workers concerning work procedures; transmit established standards of performance to workers; review work of employees for conformance to standards; and provide informal assessment of workers’ performance to the supervisor.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Preceptor Differential The Hospital shall pay a differential of $1.50 per hour to a nurse who is designated by nursing management to serve as a preceptor to provide on-the-job training to newly hired nurses. One differential will be paid per shift per orientee to the primary preceptor for all hours served as the primary preceptor for that shift. Preceptor will only be paid while the newly hired nurse is in a one-to-one status. Preceptor is a voluntary assignment and the nurse has the option to refuse the preceptor assignment.

  • Shift Differential The shift differential for employees working on assigned shifts which begin before 6:00 A.M. or which end at or after 7:00 P.M. shall be sixty-five cents ($0.65) per hour for all hours worked on that shift. Such shift differential shall be in addition to the employee's regular rate of pay and shall be included in all payroll calculations, but shall not apply during periods of paid leave. Employees working the regular day schedule who are required to work overtime or who are called back to work for special projects shall not be eligible for the shift differential.

  • CLEC OUTAGE For a problem limited to one CLEC (or a building with multiple CLECs), BellSouth has several options available for restoring service quickly. For those CLECs that have agreements with other CLECs, BellSouth can immediately start directing traffic to a provisional CLEC for completion. This alternative is dependent upon BellSouth having concurrence from the affected CLECs. Whether or not the affected CLECs have requested a traffic transfer to another CLEC will not impact BellSouth's resolve to re-establish traffic to the original destination as quickly as possible.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Fixed Kilowatt-Hour Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt-hour rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt-Hour Rate Product – Month-to-month variable kilowatt-hour rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. After the first month, the price may vary based on a number of factors, including market supply prices, energy capacity prices, settlement costs and other market- related factors, as determined at our discretion, plus estimated total state taxes, fees, charges or other assessments, along with our costs, expenses and profit margins. There is no limit on how much the price may change from one billing cycle to the next. The price can change each billing period. The Customer will not know the price until receiving the bill. A customer may obtain the previous 24 months’ average monthly billed price for the customer’s rate class and service territory at 1.800.746.4702 and xxx.xxxxxxxxxxxxxxx.xxx. Historical pricing is not indicative of present or future pricing. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.

  • Bilingual Differential When formally assigned in the employee’s position description, an employee assigned to interpret to or from another language to English will receive a differential of five percent (5%) of base pay.

  • Outages 9.7.1.1 Outage Authority and Coordination. Interconnection Customer and Transmission Owner may each in accordance with Good Utility Practice in coordination with the other Party and Transmission Provider remove from service any of its respective Interconnection Facilities, System Protection Facilities, Network Upgrades, System Protection Facilities or Distribution Upgrades that may impact the other Party’s facilities as necessary to perform maintenance or testing or to install or replace equipment. Absent an Emergency Condition, the Party scheduling a removal of such facility(ies) from service will use Reasonable Efforts to notify one another and schedule such removal on a date and time mutually acceptable to the Parties. In all circumstances, any Party planning to remove such facility(ies) from service shall use Reasonable Efforts to minimize the effect on the other Parties of such removal.

Time is Money Join Law Insider Premium to draft better contracts faster.