Wastewater Management and Disposal Sample Clauses

Wastewater Management and Disposal. Given the depth to groundwater at the Site, the IRM activities did not encounter saturated soils. However, due to inclement weather during the demolition program, storm water did accumulate in certain excavations completed to address soils discussed herein. Accumulated storm water that was in contact with known or potentially contaminated soils was containerized on-site in two temporary aboveground storage tanks (e.g., Xxxxx tanks) prior to waste classification sampling. Based on the constituents of concern in soils at the Site and on disposal facility requirements, samples of accumulated wastewater were analyzed for PPMs+Ba. Analytical results for these samples (see Appendix B) indicated that all of the recovered wastewater was classified as RCRA non-hazardous waste. All of the wastewater recovered during the IRM (a total of approximately 46,000 gallons) was disposed of off-site at the Xxxxx facility. Disposal documentation related to this wastewater disposal is provided on CD in Attachment F.
AutoNDA by SimpleDocs

Related to Wastewater Management and Disposal

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Retention and disposal 9.5.1. Information shared under this Agreement will be securely stored and disposed by secure means when no longer required for the purpose for which it is provided as per each parties’ Information Security Policy, unless otherwise agreed in a specific case, and legally permitted. Each party will determine and maintain their own retention schedule.

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • Garbage Disposal You are responsible for ensuring Your and Your guests’ rubbish is removed from the Room, Building and Common Property in a timely manner and properly deposited in the communal rubbish areas allocated by Us for collection. You must use all garbage chutes according to pasted instructions near chutes.

  • Waste Management 4.1 Has your company been issued an EPA Hazardous Waste Generator I.D. Number? Existing Tenants should describe any additional identification numbers issued since the previous certificate. Yes [ ] No [ ]

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Slash Disposal Purchaser’s timing of product removal and preparatory work shall not unnecessarily xx- xxx slash disposal. Specific slash disposal measures to be employed by Purchaser are stated in C6.7 and are in ad- dition to Required Deposits for slash disposal.

  • Patch Management All workstations, laptops and other systems that process and/or 20 store PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or 21 transmits on behalf of COUNTY must have critical security patches applied, with system reboot if 22 necessary. There must be a documented patch management process which determines installation 23 timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable 24 patches must be installed within thirty (30) calendar or business days of vendor release. Applications 25 and systems that cannot be patched due to operational reasons must have compensatory controls 26 implemented to minimize risk, where possible.

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following:

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!