WATER SYSTEM PROCEDURE Sample Clauses

WATER SYSTEM PROCEDURE. A. Adjust water systems to provide required or design quantities. B. Use calibrated Venturi tubes, orifices, or other metered fittings and pressure gauges to determine flow rates for system balance. Where flow metering devices are not installed, base flow balance on temperature difference across various heat transfer elements in the system. C. Adjust systems to provide specified pressure drops and flows through heat transfer elements prior to thermal testing. Perform balancing by measurement of temperature differential in conjunction with air balancing. D. Effect system balance with automatic control valves fully open to heat transfer elements. For 3- way control valves the rated pressure drop shall first be adjusted with the 3-way valve set so that all the water flows through the coil. The bypass balancing valve shall then be adjusted on each coil until equal pressure drop between supply and return connections is obtained, with the 3-way valve set to bypass the coil. E. Effect adjustment of water distribution systems by means of balancing cocks, valves, and fittings. Do not use service or shut-off valves for balancing unless indexed for balance point.
AutoNDA by SimpleDocs

Related to WATER SYSTEM PROCEDURE

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • ORDERING PROCEDURE Orders placed against this contract may be in the form of an agency issued purchase order on an as-required basis. Or an agency may also use the Arkansas State Purchasing Card (P- Card) to purchase furniture.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Project Implementation The Borrower shall:

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • BILLING PROCEDURE a. The Contractor shall submit, not more than semi-monthly, properly completed A-19 vouchers (the "voucher") to one of the following: The Department of Children, Youth, and Families Attn: Xxxxx Xxxx PO Box 40972 Olympia WA 98504-0972 Or, email a scan of an original, signed A-19 voucher directly to the DCYF Contract Manager at Xxxxx.xxxx@xxxx.xx.xxx b. Payment to the Contractor for approved and completed work shall be made by warrant or Electronic Funds Transfer by DCYF and considered timely if made within 30 days of receipt of a properly completed voucher. Payment shall be sent to the address designated by the Contractor and set forth in this Contract. c. Each voucher must clearly reference the DCYF Contract Number and the Contractor's Statewide Payee Registration number assigned by the Office of Financial Management (OFM). d. Properly completed vouchers and attachments completed by the Contractor must contain the information described in Exhibit A under the Section titled "Compensation and Voucher Payment".

  • Work Scheduling Except at the request of an affected employee, no employee shall have the number of hours they are normally scheduled to work reduced as the result of the use of non-permanent employees such as, but not limited to: seasonal, intermittent, student interns, interns, interim, established term, or temporary employees, due to the performance of such employee’s duties by the nonpermanent employee.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.