EPC Work definition

EPC Work means the engineering, procurement and construction of a solar tower thermal electric power plant, including the design, procurement and delivery of equipment, construction, installation, commissioning, testing, provision of warranty and all other work or services required for a turnkey project. For the avoidance of doubt, EPC Work includes the installation of the Solar Field.
EPC Work means engineering, procurement or construction services, the sale/purchase of any photovoltaic equipment, or maintenance and operations services, in each case provided by Purchaser to the Company in relation to the M24 Project.

Examples of EPC Work in a sentence

  • The EOI applicant shall duly attach the Letter of Award (LOA)/Work order and the Commissioning Certificate of each EPC Work from the Client/PSU/DISCOM/Nodal agency/any Gov department.

  • Staff will consider these suggestions at the next EPC Work Session.

  • Phase 1 short-term focused principle areas will be reviewed in a City Council- EPC Work Session in May 2018.

  • Project Partners: The Municipal Association of SC, and met with the SC private water and wastewater technical assistance providers about the project.

  • For EPC Work Orders / LSTK Work Orders to be submitted against experience, the job scope shall broadly include Detailed Engineering, Procurement, Construction & Assistance in Commissioning, Performance Guarantee Test Run (PGTR) etc.

  • Business work flow Modeling with Event Driven Process Chains (EPC), Work flow analysis with Petri nets.

  • As such, the Council determined that most of the elements in the draft 2016 EPC Work Plan should be reviewed concurrently with the Town’s draft Climate Action Plan.

  • In case the EPC Work in any or complete stretch is awarded during the currency of the Strengthening Work, the scope of the Strengthening Work shall be accordingly reduced or if deemed necessary, the Strengthening Work Contract may be foreclosed, as soon as the Appointed Date of the EPC Work is declared.

  • The Corporate Debtor was specifically promoted to set-up a secondary Iron and Steel unit with facilities for making Sponge Iron, Steel Billets, TMT Bars, Angles, Beams, Channels, Transmission Line Towers, Substation Structure, generation of Power and EPC Work of Transmission Line Towers and Substations.

  • The following documents/Reports/Licenses and notifications were referred in order to prepare the Social Safeguard Due Diligence Report: Project Information Memorandum (PIM); Detailed Project Report (DPR); Lender’s Independent Engineer’s Report February 2020 ; Project Statutory Approvals; Project HSE Documents; Concession Agreement(CA) ; Right of Way Hand over letter; Gazette notification; Labour License ; EPC Work Orders/; Discussion with developer; 27.

Related to EPC Work

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Project Work means the work required to complete the Project.

  • a work means the outcome of building or civil engineering works taken as a whole which is sufficient in itself to fulfil an economic or technical function;

  • Project Improvements means site improvements and facilities that are:

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Construction Work means any work in connection with⎯

  • tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • job work means any treatment or process undertaken by a person on goods belonging to another registered person and the expression “job worker” shall be construed accordingly;

  • EPC Contractor means Seller’s engineering, procurement and construction contractor or such Person performing those functions.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Contract Work means everything required to be furnished and done by the Contractor by any one or more of the parts of the Contract referred to in Article 1, except Extra Work as hereinafter defined.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • DAY WORK means on item of work requiring the employment of labour with or without materials as the case may be, which, in the opinion of the Senior Engineer /Civil-in-charge, is not capable of being evaluated by the accepted methods of measurement or assessment and is paid for on the basis of the actual labour and materials utilised on the particular item of work referred to.

  • Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;