Geotechnical engineer means a Professional Engineer whose principal field of specialization is the design and Construction of earthworks in a permafrost environment.
Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.
Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.
Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.
Initial Engineering Report means the engineering report concerning Oil and Gas Properties of Loan Parties dated as of June 30, 2016, prepared internally by the Borrower.
CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.
Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
CREFC® Operating Statement Analysis Report The monthly report in the “Operating Statement Analysis Report” format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
Engineering Reports has the meaning assigned such term in Section 2.07(c)(i).
Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.
conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;
Site Assessment means a Site Assessment as defined in Paragraph 10(c).
Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.
Survey Report means a report of the results of a Survey, containing the information set out in clause 12.4 and Schedule 6.
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
Technical Report means a report prepared and filed in accordance with this Instrument and Form 43-101F1 Technical Report that includes, in summary form, all material scientific and technical information in respect of the subject property as of the effective date of the technical report; and
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;
Base Case Projections means the initial forecast for the Project prepared as of the Effective Date using the Base Case Financial Model.
Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.
Feasibility Report means a detailed report, in form and substance sufficient for presentation to arm's length institutional lenders considering project financing, showing the feasibility of placing any part of the Property into commercial production as a Mine and shall include a reasonable assessment of the various categories of ore reserves and their amenability to metallurgical treatment, a complete description of the work, equipment and supplies required to bring such part of the Property into commercial production and the estimated cost thereof, a description of the mining methods to be employed and a financial appraisal of the proposed operations and including at least the following:
(i) a description of that part of the Property to be covered by the proposed Mine;
(ii) the estimated recoverable reserves of Minerals and the estimated composition and content thereof;
(iii) the proposed procedure for development, mining and production;
(iv) results of ore amenability treatment tests (if any);
(v) the nature and extent of the facilities proposed to be acquired, which may include mill facilities if the size, extent and location of the ore body makes such mill facilities feasible, in which event the study shall also include a preliminary design for such mill;
(vi) the total costs, including capital budget, which are reasonably required to purchase, construct and install all structures, machinery and equipment required for the proposed Mine, including a schedule of timing of such requirements;
(vii) all environmental impact studies and costs of implementation;
(viii) the period in which it is proposed the Property shall be brought to commercial production; and
(ix) such other data and information as are reasonably necessary to substantiate the existence of an ore deposit of sufficient size and grade to justify development of a mine, taking into account all relevant business, tax and other economic considerations including a cost comparison between purchasing or leasing and renting of facilities and equipment required for the operation of the Property as a Mine.
Physical Conditions Report means, with respect to the Property, a report prepared by a company satisfactory to Lender regarding the physical condition of the Property, satisfactory in form and substance to Lender in its sole discretion, which report shall, among other things, (a) confirm that the Property and its use complies, in all material respects, with all applicable Legal Requirements (including, without limitation, zoning, subdivision and building laws) and (b) include a copy of a final certificate of occupancy with respect to all Improvements on the Property.
Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.
Baseline area means any intra- state area (and every part thereof) des- ignated as attainment or unclassifiable under section 107(d)(1)(A)(ii) or (iii) of the Act in which the major source or major modification establishing the minor source baseline date would con- struct or would have an air quality im- pact for the pollutant for which the baseline date is established, as follows: equal to or greater than 1 μg/m3 (an- nual average) for SO2, NO2, or PM10; or equal or greater than 0.3 μg/m3 (annual average) for PM2.5.(ii) Area redesignations under section 107(d)(1)(A)(ii) or (iii) of the Act cannot intersect or be smaller than the area of impact of any major stationary source or major modification which:
Phase I Report means, with respect to any Facility, a report that (i) conforms to the ASTM Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, E 1527, (ii) was conducted no more than six months prior to the date such report is required to be delivered hereunder, by one or more environmental consulting firms reasonably satisfactory to Administrative Agent, (iii) includes an assessment of asbestos-containing materials at such Facility, (iv) is accompanied by (a) an estimate of the reasonable worst-case cost of investigating and remediating any Hazardous Materials Activity identified in the Phase I Report as giving rise to an actual or potential material violation of any Environmental Law or as presenting a material risk of giving rise to a material Environmental Claim, and (b) a current compliance audit setting forth an assessment of Holdings’, its Subsidiaries’ and such Facility’s current and past compliance with Environmental Laws and an estimate of the cost of rectifying any non-compliance with current Environmental Laws identified therein and the cost of compliance with reasonably anticipated future Environmental Laws identified therein.
Architect/Engineer means the person designated by the Commissioner to provide the Contract drawings and Detailed Specifications for the Work you are to perform.