Minimum Required Capacity definition

Minimum Required Capacity shall have the meaning assigned to it in Section 11.3.1.
Minimum Required Capacity for each Facility for purposes of this Agreement shall be equal to 90% of the Expected Capacity of such Facility. At the end of the Acceptance Testing Period under Section 11.2.3, it is expected that each of the three Facilities shall have demonstrated the capability to produce 7.0MW-DC (5.0 MW AC), subject to final as-build system size (the “Expected Capacity”), based upon the Acceptance Testing results. Contractor hereby guarantees that each Facility shall perform at not less than 97% of the Expected Capacity by the end of the Acceptance Testing Period (the “Acceptance Test Capacity Guarantee”). Contractor and the Testing Engineer shall be entitled to conduct and verify satisfaction of the Acceptance Tests in stages and in such order as may be appropriate given the available testing conditions. In the event that a Facility fails to meet the Acceptance Test Capacity Guarantee, the following shall apply:
Minimum Required Capacity has the meaning set forth in Section 2.4 of the Agreement, but includes ** and **.

Examples of Minimum Required Capacity in a sentence

  • If a Load Serving Member’s System Capacity for a Capacity Year is comprised of at least seventy-five percent hydro-based generation, then such Load Serving Member’s Minimum Required Capacity Margin for that Capacity Year shall be nine percent.

  • If a Load Serving Member’s System Capacity for a Capacity Year is comprised of at least seventy- five percent hydro-based generation, then such Load Serving Member’s Minimum Required Capacity Margin for that Capacity Year shall be nine percent.

  • A Load Serving Member’s System Capacity Responsibility for any Capacity Year shall mean the sum of that Load Serving Member's System Peak Responsibility and its Minimum Required Capacity Margin.

  • SPP Criteria section 2.1.9; “Each Load Serving Member’s Minimum Required Capacity Margin shall be twelve percent.” Capacity margin is calculated as{((1/0.88)-1)*estimated peak load}.

  • Each Load Serving Member’s Minimum Required Capacity Margin shall be twelve percent.

  • The MTF recommends that the ORWG and/or TWG specify the frequency and method by which the Minimum Required Capacity Margin will be revisited.

  • If between the 2013 and 2016 Regional Cost Allocation Reviews (or other future Regional Cost Allocation Reviews), the capacity margin in SPP is not reviewed and reduced, there would be no quantifiable benefit based on the Reduction of Members’ Minimum Required Capacity Margin.

  • Each Load Serving Member’s Minimum Required Capacity Margin shall be ten point seven (10.7%) percent (equivalent to a 12% reserve margin).

  • The MTF proposes that for forward-looking benefit calculations, benefits under Section 5.1 be calculated only if there is either an actual change in the Minimum Required Capacity Margin or, alternatively, an explicit commitment on the part of SPP to reduce the Minimum Required Capacity Margin in a specific future year.

  • If a Load Serving Member’s System Capacity for a Capacity Year is comprised of at least 75 percent hydro-based generation, then such Load Serving Member’s Minimum Required Capacity Margin for that Capacity Year shall be nine percent.


More Definitions of Minimum Required Capacity

Minimum Required Capacity. “ shall have the meaning assigned to it in Section 11.3.1. “Owner Event of Default “ shall have the meaning assigned to it in Section 13.3.

Related to Minimum Required Capacity

  • Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Rated Capacity means the Average Daily Flow for which the Works are approved to handle;

  • Installed Capacity or 'IC’ means the summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals), approved by the Commission from time to time;

  • Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;

  • Unforced Capacity shall have the meaning specified in the Reliability Assurance Agreement.

  • Licensed capacity means the number of children the Department has determined the day care home can care for at any one time in addition to any children living in the home who are under the age of 12 years. Children age 12 and over on the premises are not considered in determining licensed capacity.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Storage Capacity means any combination of space, injectability and deliverability.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Final RTO Unforced Capacity Obligation means the capacity obligation for the PJM Region, determined in accordance with RAA, Schedule 8. Financial Close:

  • Available RP Capacity Amount means the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 6.04(a)(ii)(D), (a)(vii) and (a)(x) minus the aggregate amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (a) make Investments pursuant to Section 6.06(q)(ii), (b) make Restricted Debt Payments pursuant to Section 6.04(b)(iv)(B) or (c) incur Indebtedness pursuant to Section 6.01(ll).

  • Bid Capacity meanss capacity offered by the bidder in his Bid under invitation.

  • Nominal Rated Capability means the nominal maximum rated capability in megawatts of a Transmission Interconnection Customer’s Customer Facility or the nominal increase in transmission capability in megawatts of the Transmission System resulting from the interconnection or addition of a Transmission Interconnection Customer’s Customer Facility, as determined in accordance with pertinent Applicable Standards and specified in the Interconnection Service Agreement.

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • indemnified capacity means any and all past, present and future service by an indemnified representative in one or more capacities as a director, officer, employee or agent of the corporation, or, at the request of the corporation, as a director, officer, employee, agent, fiduciary or trustee of another corporation, partnership, joint venture, trust, employee benefit plan or other entity or enterprise;

  • System Capacity means the operational capacity of the System at any applicable point in time.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Daily Unforced Capacity Obligation means the capacity obligation of a Load Serving Entity during the Delivery Year, determined in accordance with Reliability Assurance Agreement, Schedule 8, or, as to an FRR entity, in Reliability Assurance Agreement, Schedule 8.1. Day-ahead Congestion Price: “Day-ahead Congestion Price” shall mean the Congestion Price resulting from the Day-ahead Energy Market. Day-ahead Energy Market:

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition. For purposes of Section 23.4.5 of this Attachment H, “Offer Floor” for a Mitigated Capacity Zone Installed Capacity Supplier that is not a Special Case Resource shall mean the lesser of (i) a numerical value equal to 75% of the Mitigation Net CONE translated into a seasonally adjusted monthly UCAP value (“Mitigation Net CONE Offer Floor”), or (ii) the numerical value that is the first year value of the Unit Net CONE determined as specified in Section 23.4.5.7, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate, (“Unit Net CONE Offer Floor”). The Offer Floor for a Mitigated Capacity Zone Installed Capacity Supplier that is a Special Case Resource shall mean a numerical value determined as specified in Section 23.4.5.7.5. The Offer Floor for Additional CRIS MW shall mean a numerical value determined as specified in Section 23.4.5.7.6. For the purposes of Section 23.4.5 of this Attachment H, “Non-Qualifying Entry Sponsors” shall mean a Transmission Owner, Public Power Entity, or any other entity with a Transmission District in the NYCA, or an agency or instrumentality of New York State or a political subdivision thereof.

  • RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes.