Permanent Repairs definition

Permanent Repairs means any and all repairs relating to the Aircraft which:
Permanent Repairs. Repairs undertaken after the occurrence of a disaster to restore the highway to its pre-disaster condition. (source] Right-of-Way (general definition): The area covered in the current or planned HED. Right-of-Way (for maintenance activities): The legal limits of the HED if a HED exists, or the area between the existing top of cuts and toe of fills if no easement exists. Right-of-Way Grant: Includes an easement, lease, permit, or license to occupy, use, or traverse BLM lands. [ source] Scenic Integrity Objectives: Scenic Integrity indicates the degree of intactness arid wholeness of the landscape character . The scenic integrity objectives establish limits of acceptable human alterations as the landscape moves toward a landscape character goal. Special Use Permit A written permit, that authorizes use or occupancy of USFS lands and specifies the terms and conditions under which the use or occupancy may occur. [source] Sensitive Species: Generally, refers to species that are declining or appear to be in need of conservation.·usFS and BLM maintain. lists of sensitive spades that must be considered to satisfy USFS and BLM environmental clearances. VisualImpact Assessment: May be required in major reconstruction projects where there is a substantial visual change proposed in the highway corridor, where new or out-of-kind replacement buildings, bridges or other structures are proposed, or where there is significant vegetative cutting along state highways . APPENDIX A-3 SUPPLEMENTAL VISUAL AND SCENIC RESOURCES GUIDE FOR COOT MAINTENANCE AND OPERATIONS COOT has agreed to implement project-specific design protocols to support USFS and BLM management plan standards and guidelines for visual and scenic quai ty. These protocols help soften visual impacts associated with highways and their appurtenances. Topics discussed in this overview apply to new construction, reconstruction and maintenance projects by COOT and do not apply to existing xxxxxxxxxx.Xxxxxx, safety, and welfare will take precedent concerning temporary replacement of theitems in this appendix. General Requirements All projects will avoid and/or minimize disturbance to vegetation.All disturbed areas will be revegetated as appropriate. Color selection will be determined during the NEPA process. In this document, Federal ·Standard colors are referenced.
Permanent Repairs means repairs undertaken after the occurrence of a disaster to restore the highway to its pre-disaster condition. They occur after emergency repairs have been completed and usually require the development of plans, specifications and estimates. They will likely require some design effort and may require geotechnical studies or other engineering studies, structural analysis or environmental reviews. The replacement of bridges, construction of retaining structures, highway relocations or the addition of significant protective measures are usually considered permanent repairs. Work outside of the roadway section and repairs to non-essential facilities such as rest areas are considered permanent repairs.

Examples of Permanent Repairs in a sentence

  • Report (March 9, 2006) from the General Manager of Transportation Services and the Manager of Goods and Services, Purchasing and Materials Management, advising on the results of the Tender issued for Permanent Repairs to Utility Cuts in Toronto and East York District, in accordance with specifications as required by Transportation Services, and requesting authority to award a contract to the recommended bidder.

  • Secure MOT $1,000 per day per location Permanent Repairs within 7 days of notification.

  • Consequently, tolerance to acceleration, especially during short-radius centrifugation, must be further investigated both after spaceflight and after bed rest.

  • Recommendation: The General Manager of Transportation Services and the Director of Purchasing and Materials Management recommend that authority be granted to award a contract for Tender Call No. 26-2007, for Permanent Repairs to Utility Cuts, Wards 8 and 10, North York District, to Ferpac Paving Inc., in the amount of $787,621.00, net of GST, having submitted the lowest bid.

  • Report (March 20, 2007) from the General Manager, Transportation Services and the Director, Purchasing and Materials Management, advising on the results of Tender Call 31-2007 issued for the Permanent Repairs to Utility Cuts, in accordance with specifications as required by Transportation Services, and requesting the authority to award a contract to the recommended bidder.

  • Permanent Repairs: Repairs undertaken after the occurrence of a disaster to restore the highway to its pre-disaster condition.

  • Recommendation: The General Manager of Transportation Services and the Director of Purchasing and Materials Management recommend that authority be granted to award Contract 07EY-101TU, Tender Call 07-2007, for Permanent Repairs to Utility Cuts - Etobicoke York District, Wards 5 and 6, to Paddock Developments Limited, in the amount of$1,857,650.00, net of GST, having submitted the lowest bid.

  • Recommendation: The General Manager of Transportation Services and the Director of Purchasing and Materials Management recommend that authority be granted to award a contract for Tender Call No. 21-2007, for Permanent Repairs to Utility Cuts, Ward 16, North York District, to Ferpac Paving Inc., in the amount of $1,598,338.00, net of GST, having submitted the lowest bid.

  • Recommendation: The General Manager of Transportation Services and the Director of Purchasing and Materials Management recommend that authority be granted to award Contract 07EY-100TU, Tender Call 06-2007, for Permanent Repairs to Utility Cuts - Etobicoke York District, Wards 1, 2, 3 and 4, to Paddock Developments Limited, in the amount of$1,852,875.00, net of GST, having submitted the lowest bid.

  • Recommendation: The Director of Purchasing and Materials Management recommends that authority be granted to award Contract 07EY-106TU, Tender Call 218-2007, for Permanent Repairs to Utility Cuts - Etobicoke York District, Ward 17, to Sunrise Contracting Inc., in the amount of $ 2,389,764.00, net of GST, having submitted the lowest bid.


More Definitions of Permanent Repairs

Permanent Repairs means repairs undertaken after the occurrence of a disaster to restore the highway to its pre-disaster condition. They occur after emergency repairs have been completed and usually require the development of plans, specifications and estimates. They will likely require some design effort and may require geotechnical studies or other engineering studies, structural analysis or environmental reviews. The replacement of bridges, construction of retaining structures, highway relocations or the addition of significant protective measures are usually considered permanent repairs. Work outside of the roadway section and repairs to non- essential facilities such as rest areas are considered permanent repairs

Related to Permanent Repairs

  • Permanent Work means the permanent works including equipment to be supplied, executed, erected and maintained in accordance with the Contract.

  • Required Repairs shall have the meaning set forth in Section 7.1.1 hereof.

  • Repairs means the repairs to be made to the Mortgaged Property, as described on the Repair Schedule of Work (Exhibit C) or as otherwise required by Lender in accordance with this Loan Agreement.

  • Permanent Works means the permanent works to be executed by the Contractor under the Contract.

  • Major repair means either: (1) for a dispersal system, repairs required for an OWTS dispersal system due to surfacing wastewater effluent from the dispersal field and/or wastewater backed up into plumbing fixtures because the dispersal system is not able to percolate the design flow of wastewater associated with the structure served, or (2) for a septic tank, repairs required to the tank for a compartment baffle failure or tank structural integrity failure such that either wastewater is exfiltrating or groundwater is infiltrating.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Repair means to restore to proper operating condition a tank, pipe, spill prevention equipment, overfill prevention equipment, corrosion protection equipment, release detection equipment or other UST system component that has caused a release of product from the UST system or has failed to function properly.

  • Emergency Repairs means repairs to a utility facility located in or adjacent to a primary city street that must be performed immediately when the necessity arises to safeguard life or property or maintain continued operation of the facility.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Permanent residence means a place where the person abides, lodges, or resides for 5 or more consecutive days.

  • Permanent sign means any structure, display, logo, device or representation which is designed or used to advertise or call attention to any item, business, activity or place and is visible from outside a building that is intended to be in place for a period that is longer than 30 days. [Amended Eff. 11/10/2007]

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • permanent establishment means a fixed place of business through which the business of an enterprise is wholly or partly carried on.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Emergency repair means work necessary to prevent destruction or dilapidation to real property or structural appurtenances thereto immediately threatened or damaged by fire, flood, earthquake or other disaster.

  • Permanent radiographic installation means an enclosed shielded room, cell, or vault, not located at a temporary jobsite, in which radiography is performed.

  • Good repair means about eighty percent of materials and compo- nents are unbroken, have all their pieces, and can be used by children as intended by the manufacturer or builder.

  • Punch List means the list of items, prepared in connection with the inspection of the Project by the Owner’s Representative or Architect in connection with Substantial Completion of the Work or a portion of the Work, which the Owner’s Representative or Architect has designated as remaining to be performed, completed or corrected before the Work will be accepted by the Owner.

  • Substantial improvement means any combination of repairs, reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during any one-year period for which the cost equals or exceeds 50 percent of the market value of the structure before the “start of construction” of the improvement. This term includes structures which have incurred “substantial damage”, regardless of the actual repair work performed. The term does not, however, include either:

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Punchlist means a list of items of Work to be completed or corrected by Contractor after Substantial Completion. Punchlists indicate items to be finished, remaining Work to be performed, or Work that does not meet quality or quantity requirements as required in the Contract Documents.