Examples of Postclosure plan in a sentence
The proposed Project also meets the additional minimum requirements/standards for secure landfills with respect to: • A dual liner system (the landfill will actually have a triple liner system);• Leachate detection, collection and removal system;• Groundwater quality protection;• Water control and discharge;• Dust control;• Closure standards; and• Post-closure plan.
At the changeover to the Registration process reference was made to the Environmental Protection (Rural Landfill) Regulations of 2002, which appear to be similar, however the latter include requirements for a Post-closure plan.
Post-closure plan approval.SRTF = 24 months (2 years).Incinerator permit.Burning boiler and industrial furnace (BIF) permit.