Preliminary Project Schedule definition

Preliminary Project Schedule is defined in Section 2.4 and shown in Exhibit A.
Preliminary Project Schedule has the meaning set forth in Exhibit G.
Preliminary Project Schedule means that preliminary schedule for performance of the Work set forth in the attached Exhibit A. Said schedule shall be modified based on final development of the Project Scope Definition, the governmental approval process and the timing of Owner’s acceptance of Design/Builder’s Proposal.

Examples of Preliminary Project Schedule in a sentence

  • The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP.

  • Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule.

  • The Preliminary Project Schedule may be summary in nature for the remaining performance period.

  • Within 15 calendar days after the NTP is acknowledged submit the Preliminary Project Schedule defining the planned operations detailed for the first 90 calendar days for approval.

  • Submit the Preliminary Project Schedule, defining the Contractor's planned operations for the first 90 calendar days for approval within 15 calendar days after the NTP is acknowledged.

  • A Preliminary Project Schedule (PPS) within twenty-one (21) days after receiving the Notice to Proceed (NTP).

  • Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Project Scheduler Qualifications; G Preliminary Project Schedule; G Initial Project Schedule; G Periodic Schedule Update; G 1.3 PROJECT SCHEDULER QUALIFICATIONS Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports.

  • The Contractor's submission of the Preliminary Project Schedule shall include four (4) copies and one (1) reproducible.

  • The Joint Board may require modifications to the Preliminary Project Schedule under the Agreement and may disapprove the Preliminary Project Schedule, or any portion thereof, if submitted for approval under the Agreement.Exhibit C PRICE PROPOSAL INSTRUCTIONS 1.0 General Instructions This Exhibit C describes the submission format for price proposals and outlines the required information that will comprise a Price Proposal.

  • Within the timeframe established in Section 2.01.B, Design Builder shall submit a Preliminary Project Schedule that reflects Design Builder’s sequence of design, procurement and construction activities including the interrelationships of the Demolition and Construction Packages.


More Definitions of Preliminary Project Schedule

Preliminary Project Schedule as attached hereto as Exhibit C.
Preliminary Project Schedule shall have the meaning provided in
Preliminary Project Schedule has the meaning ascribed thereto in Section 2.7(h);
Preliminary Project Schedule means a preliminary Project Schedule Approved by the Project Committee which is based on the Preliminary Project Requirements and Preliminary Design Framework, and is determined in accordance with Section 4.5(a);
Preliminary Project Schedule. The preliminary schedule for the Project, dated August 3, 2004, that has been tentatively agreed upon by the Members and is attached hereto as Exhibit I.
Preliminary Project Schedule has the meaning ascribed thereto in the Project Framework Agreement;

Related to Preliminary Project Schedule

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Preliminary plat means a map showing the salient features of a proposed subdivision submitted to an approving authority for purposes of preliminary consideration.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Preliminary Plans means a site plan, architectural floor plans, elevations, outline specifications and a cost estimate for each utility, site development, conversion, and remodeling project. The drawings shall be sufficiently descriptive to accurately convey the location, scope, cost and the nature of the improvement being proposed.

  • Approved Project Budget means the most recent statement, approved by the FTA, of the costs of the Project, the maximum amount of Federal assistance for which the TJPA is currently eligible, the specific tasks (including specified contingencies) covered, and the estimated cost of each task.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • Preliminary Mortgage Schedule As defined in Section 3.

  • Project Budget means the budget and project description included in the grant application. The Project Budget must succinctly describe all major elements of project work, the estimated cost of each, and clearly allocate requested grant funding and match contributions to each.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Space Plan means the space plan to be prepared by Tenant in accordance with paragraph 2 below and approved by Landlord and Tenant, and showing the general configuration of the Tenant Improvements.

  • Development Schedule shall have the meaning set forth in Section 1.1.

  • Contract Schedule The list (as such list may be amended from time to time) identifying each Contract constituting part of the corpus of the Trust Fund as of the Cut-off Date, and which (a) identifies each Contract as either a Fixed Rate Contract or Adjustable Rate Contract and by contract number and name and address of the Obligor and (b) sets forth as to each Contract (i) the unpaid principal balance as of the related Transfer Date determined by giving effect to payments received prior to the related Transfer Date, (ii) the amount of each scheduled payment due from the Obligor, and (iii) the APR.

  • BASE budget means the minimum general fund budget of a district, which includes 80% of the basic

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Specification Schedule means the Schedule containing details of the Specification.

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Project area budget means a multiyear projection of annual or cumulative

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Base Case Projections means the initial forecast for the Project prepared as of the Effective Date using the Base Case Financial Model.