Process weight rate definition

Process weight rate means, for continuous or long-run steady-state source operations, the total process weight for the entire period of continuous operation or for a typical portion thereof. For a cyclical or batch source operation, the total process weight for a period that covers a complete operation or an integral number of cycles divided by the number of hours of actual process operation during such a period. Where the nature of any process or operation, or the design of any equipment, is such as to permit more than one interpretation of this definition, the interpretation that results in the minimum value for allowable emission shall apply.
Process weight rate means a rate established as follows:
Process weight rate means the actual weight or engineering approximation thereof of all materials except liquid and gaseous fuels and combustion air introduced into any process per hour. For a cyclical or batch operation, the process weight rate shall be determined by dividing such actual weight or engineering approximation thereof by the number of hours of operation excluding any time during which the equipment is idle. For continuous processes, the process weight rate shall be determined by dividing such actual weight or engineering approximation thereof by the number of hours in one complete operation, excluding any time during which the equipment is idle.

Examples of Process weight rate in a sentence

  • P = Process weight rate (1000 lbs/hr) Applicable Compliance Method: Compliance is based on a stack test performed on a 1 ton per hour sweat furnace at Reserve Iron and Metal, L.P. on December 1, 1992.

  • In the event Novation and Neoforma in good faith dispute the * Results or if Novation and Neoforma have not reached agreement after the * Review Period, Novation may dispute such outcome in accordance with the provisions of Section 18 hereto.

  • Process weight rate (pounds per hour) Permit to install 0 to 1000 $ 200 1001 to 5000 500 5001 to 10,000 750 10,001 to 50,000 1000 more than 50,000 1250 In any process where process weight rate cannot be ascertained, the minimum fee shall be assessed.

  • Children not participating in a class field trip should not report to school on that day.

  • Applicable Compliance Method: The emission limitation was established based upon OAC rule 3745-17-11 Table I requirements as follows: E = 4.10(P)0.67Where, E = Allowable emission rate, in pounds per hour; and P = Process weight rate, 0.45 ton per hour, which is determined based upon facility provided information of maximum 450 pounds per batch capacity and 2 batches per hour for this emissions unit.


More Definitions of Process weight rate

Process weight rate means, for continuous or long-run steady-state source operations, the total process weight for the entire period of continuous operation or for a typical portion thereof. For a cyclical or batch source operation, the total process weight for a period that covers a complete operation or an integral number of cycles divided by
Process weight rate means a rate established pursuant to Section 17.16.130F17.16.130(F).
Process weight rate means the process weight for any specific process measured over a one (1) hour time period;
Process weight rate means the hourly rate derived by dividing the total process weight by the number of hours in one complete operation from the beginning of any given process to the completion thereof, or from the beginning to the completion of a typical portion thereof, excluding any time during which the equipment is idle.
Process weight rate means a rate established pursuant to R18-2-702(E).
Process weight rate means the total process weight introduced into the source operation over a specific time period divided by that time period in hours. For a cyclical or batch operation, the time period shall be that time required to complete one operation or an integral number of cycles, and for continuous or long-run steady-state operations, time period shall be the total operating time or a typical portion.
Process weight rate means the total process weight divided by the number of hours in one complete operation from the beginning of any given process to the completion thereof, excluding any time during which the equipment is idle.