Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
Project Name means the name of the project stated in SCC.
CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.
CREFC® Operating Statement Analysis Report The monthly report in the “Operating Statement Analysis Report” format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.
Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.
Project Engineer means the surveyor or engineer employed by or private
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.
Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Development Project means a project for the development of land within a
Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.
The Works/Project means the works to be executed or done under this contract.
Commercial project means any project, including, but not
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Project area budget means a multiyear projection of annual or cumulative
Approved Project means the Scheme application of the Applicant approved by the CIC.
Construction project means the same as that term is defined in Section 38-1a-102.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.
Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.
Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.