Examples of Safe Work Permit in a sentence
A Safe Work Permit is a permit that authorizes certain types of work that may be potentially dangerous to building occupants or disruptive to the building services and operations.
Health and Safety PolicyIntroduction In addition, there is to be a review of the Safe Work Permit each day by the Contractor Site Supervisor with his or her employees before commencing work.
Prior to the start of work on each site, a site-specific hazard assessment is to be conducted and Safe Work Permit completed.
Prior to doing any work at these sites, the Contractor and all Sub Contractors must attend a Safe Work Permit Meeting with Site Management to review the Site specific hazards and requirements necessary to ensure the work will be done in a safe manner.
All construction work involving, but not limited to the following requires a Safe Work Permit: (Refer to Appendix 8) Welding and open flame work (See Appendix 8) X-raying Drilling or cutting Lock-out or disabling of base building systems Fire alarm systems Sprinkler system modification (See Appendix 11) Dust producing activities Confined space entry Life Safety System testing or verification.
All construction work involving, but not limited to the following requires a Safe Work Permit: (Refer to Appendix 8)▪ Welding and open flame work (See Appendix 8)▪ X-raying▪ Drilling or cutting▪ Lock-out or disabling of base building systems▪ Fire alarm systems Sprinkler system modification (See Appendix 11)▪ Dust producing activities▪ Confined space entry▪ Life Safety System testing or verification.
All personnel associated with the work are to read and sign the work permit and abide by its conditions.Hot WorkDue to the nature of products that we store and handle on site it is essential that all hot work only be carried out under cover of a Safe Work Permit.
Finding 9: ESRB observed instances where the Safe Work Permit (SWP) was not closed out within the 12-hour time limit or not closed out by the original requestor of the permit as required by the Plant’s procedure.
The daily JHA and/or Safe Work Permit must identify and specify any special or additional PPE requirements based on the scope of work to be conducted.
All ground disturbance activities, including those receiving a ground disturbance permit, require a Safe Work Permit (SWP) with applicable accompanying JHA and FLHA prior to work commencing.