Examples of System Area in a sentence
In the Project Management System Area, it is highly recommended that the Offeror provide sufficient content and detail to answer completely the following questions.
Area Electric Power System (Area EPS): The electric power distribution system connected at the Point of Common Coupling.
In any given PCS System and/or System Area the RF Engineering Services price will be readjusted (and any amounts owed to either Party will be reimbursed) at the point in time that payment would be made for such RF Engineering pursuant to clause (iii) of this subsection 6.4(b) in accordance with the determination of the actual Final Site Count and delivery of Final RF Design applicable to such PCS System.
Shipper’s Transportation Requests in each Transportation System, Area in a Transportation System or service in an Area are checked against Qualified Need.
To the extent the Vendor is in control of any System Element Location, or other site within the System or any System Area during the term of this Contract (a "Vendor-Controlled Location") including, but not limited to, during the build-out of the Initial System, the Vendor will be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with all such Vendor-Controlled Locations.
The Study Process is applicable to an Interconnection Customer proposing to interconnect a Distributed Energy Resource (DER) with the Area Electrical Power System (Area EPS) Operator’s Distribution System, if the DER capacity is larger than 4 MW or is identified through the engineering screening process to need additional studies.
These children may belong to certain student groups struggling at UIR schools, be English learners, or may be low-income four year olds who are above 200% FPL (e.g., 350% FPL).
The System Area and Per Capita Grant is based on population and geographic area served.
The Owner may at its option choose instead to modify the System performance criteria as set forth in Exhibit F by way of a Change Order in order to account for the failure to fully and/or satisfactorily complete Microwave Relocation in any such System Area or System Sub-Area such that Substantial Completion testing in accordance with the requirements of Exhibit B3 may proceed.
However, we observed practices that could be improved upon and therefore offer the following advice.