Unplanned Shutdown definition

Unplanned Shutdown means a shutdown of the train caused by non-scheduled events, including Force Majeure events.
Unplanned Shutdown means a shutdown of the Dedicated Isotope Facilities that is required in order to ensure the health and/or safety of AECL staff, the public, the protection of the Environment, compliance with Applicable Law, or arises as a result of the failure of equipment, material or systems or is necessary for the safe protection of the Dedicated Isotope Facilities;
Unplanned Shutdown means an unscheduled event of more than twenty-four (24) hours (less than thirty (30) MT as measured in packaging per day measured from 0:00 to 23:59), caused by equipment break down or external factors such as utility supply, severe weather conditions, and operational mistakes. Notwithstanding the foregoing, shutdown time caused by unstable manufacturing conditions on the way to establish the manufacturing technology in the development stage, starting day of polymerization and planned cleaning days for the change between Xxxxxx Time Slots and JSR Time Slots as well as any blockage or alike issue due to or caused by product properties like gel content despite changing and cleaning polymer filters every four (4) days and in case of a pressure drop or increase (as the case may be) of the polymer filter of 1.5 bar or more, such pressure drop or increase being solely considered as indication for gel content and/or gel formation, shall be excluded from the shutdown time for a calculation of an Unplanned Shutdown.”

Examples of Unplanned Shutdown in a sentence

  • Both Parties shall co-operate to minimize the impact of such Unplanned Shutdown, and AECL shall use best efforts to activate any of its back-up facilities in order to minimize or avoid a disruption of the supply of Isotopes from AECL to Nordion, recognizing that it is in the best interests of both Parties that the production and supply of Isotopes be continued at the earliest possible opportunity.

  • Both Parties shall co-operate to minimize the impact of such NRU Unplanned Shutdown, recognizing that it is in the best interests of both Parties that the production and supply of Interim Period Isotopes be continued at the earliest possible opportunity.

  • Seller shall promptly notify Buyer of any Unplanned Shutdown of the Facility.

  • Unplanned Shutdown – Meter RepairsDelivery Service TypeScheme TargetRiver & ChannelFaults causing restrictions to supply will be repaired within one working day of SunWater being notified.

  • During the period of any Unplanned Shutdown, the affected Party shall, from time to time, update the unaffected Party on the expected progress towards completing the maintenance or modification, whichever is applicable.

  • Seller shall use commercially reasonable efforts to sell to third parties all quantities of Natural Gas for which Buyer is unable to take delivery during an Unplanned Shutdown affecting Buyer.

  • Each commenter will be automatically notified when they are unmuted to speak for three minutes or less.

  • Unplanned Shutdown – DurationDelivery Service TypeScheme TargetRiver & ChannelUnplanned Shutdowns will be fixed so that at least partial supply can be resumed to those customers requiring water within: • 48 hours of SunWater being notified of the event, during a peak demand period; or• 5 working days of SunWater being notified of the event, outside peak demand period • Peak demand periods are to be set in consultation with Irrigator Advisory Committee.

  • Definition: An Unplanned Shutdown is an unforseen or not planned mechanical or operational failure of SunWater’s water delivery infrastructure that stops or restricts the supply of water to a customer for more than 2 hours (including emergency repairs).

  • If the Calendar Days of an Unplanned Shutdown in one Party’s Time Slot exceed an aggregate of three (3) Calendar Days, then any time in excess of these three (3) Calendar Days shall be shared between the Parties in equal shares; If during any of either JSR’s or Xxxxxx’x respective Time Slot the following occurs: In this example, the Parties will share in equal portions sixteen (16) Calendar Days of the Unplanned Shutdown, resulting from the total of 19 Calendar Days minus 3 days.


More Definitions of Unplanned Shutdown

Unplanned Shutdown shall have the meaning given to it in Clause 8.1.

Related to Unplanned Shutdown

  • Shutdown means the cessation of operation of equipment.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Unplanned Service Interruption means any Service Interruption where events or circumstances prevent the timely communication of prior warning or notice to the Trader or any affected Customer;

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Planned Downtime means planned downtime for upgrades and maintenance to the Services scheduled in advance of such upgrades and maintenance.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Outages means the planned unavailability of transmission and/or generation facilities dispatched by PJM or the NYISO, as described in Section 35.9 of this Agreement.

  • Planned Service Interruption means a Service Interruption that has been scheduled to occur in accordance with Schedule 5;

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Unscheduled Outage means an interruption resulting in reduction of the Availability of the Element(s) / Project (as the case may be) that is not a result of a Scheduled Outage or a Force Majeure Event.

  • Scheduled Outage means the final outage plan as approved by the RPC as per the provisions of the Grid Code;

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Excused Downtime means the number of minutes in the Charging Period that the LSP is unavailable due to:

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Uncontrollable Forces means any event which results in the prevention or delay of performance by a party of its obligations under this Agreement and which is beyond the reasonable control of the nonperforming party. It includes, but is not limited to fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage, and governmental actions.

  • Waterborne disease outbreak means the significant occurrence of an acute infectious illness, epidemiologically associated with the ingestion of water from a public water system which is deficient in treatment, as determined by the Division.

  • Plant means the machinery and apparatus intended to form or forming part of the Works.

  • Normal weekly hours of work means the established standard work times and number of hours in the workweek for the position or, if standard work times and number of hours have not been established for the position, the work times and average number of hours per week actually worked by the employee in that position over the most recent 3 months before the employer files the application for designation as a participating employer.

  • Interruption Period shall have the meaning set forth in Section 5 hereof.

  • Commissioning Period has the meaning set forth in Attachment T.

  • Planned means entered in the Working Timetable;

  • Inclement Weather means any weather condition that delays the scheduled arrival or departure of a Common Carrier.

  • Unscheduled Downtime means any time when any or all of the applications and Services provided by the Supplier to the Customer shall be unavailable to the Customer due to unexpected system failures other than Scheduled Downtime or the downtime is attributable to events not under the control of the Supplier.