Wanapum Development definition

Wanapum Development means the second stage of the Priest Rapids Hydroelectric Project (F.P.C. (or FERC) Project No. 2114), as more fully described in Section 2.2 of Resolution No. 474 adopted by the Commission on June 30, 1959, or as the same may be modified in accordance with Section 2.3 of Resolution No. 474, but shall not include any generation, transmission and distribution facilities hereafter constructed or acquired by the District as a part of the Electric System, or any other utility properties of the District acquired as a separate utility system, the revenues of which may be pledged to the payment of bonds issued to purchase, construct or otherwise acquire such separate utility system.
Wanapum Development means the second stage of the Priest Rapids Project as more fully described in Section 2.2 of District Resolution No.474, which is attached as Exhibit A, but shall not include any generation, transmission and distribution facilities hereafter constructed or acquired by the District as a part of the Electric System or the Priest Rapids Development, or any other utility properties of the District acquired or constructed as a separate utility system.
Wanapum Development means those properties and facilities consisting of the Wanapum dam, site, reservoir, switchyard and power plant, including all generating facilities associated therewith, up to and including ten (10) main turbine generator units each with a nameplate rating of approximately 83, 125 kilowatts, and transmission facilities as may be required to fully integrate with the Priest Rapids Development, and to deliver power in accordance with Section 7 hereof, and any interconnecting transmission facilities to connect with the Bonneville Power Administration facilities in the vicinity of the Project.

Examples of Wanapum Development in a sentence

  • The PRPO power to be delivered hereunder shall be made available to the Purchaser, at its option, exercisable from time to time, at any one or more of the following points: The 230 kV bus of the Bonneville Power Administration’s Midway Substation; The 230 kV bus of the switchyard of the Wanapum Development; The 230 kV bus of the Vantage Substation; or At any other location mutually agreed to in writing by the District and Purchaser.

  • The District agrees to proceed diligently with the financing and construction of the Wanapum Development and, subject to Uncontrollable Forces, plans to complete the Wanapum Development by January 1, 1965.

  • Section 6 of Public Law No. 83–544 5 Purchasers also entered into contracts with Grant County for the purchase and sale of output of the Wanapum Development.

  • The District agrees that prior to commencing construction of the Wanapum Development it will have completed financing of the Wanapum Development, shall have let the major contract for the construction thereof, and shall have obtained adequate completion bonds for said contract.

  • The District covenants and agrees that it will operate and maintain the Wanapum Development in an efficient and economical manner, consistent with good business and operating practices of comparable developments.

  • The District shall establish a Board of five (5) Consulting Engineers during the construction of the Wanapum Development, which shall include two (2) engineers of outstanding ability and national reputation, selected by the District from a list of not less than four (4) such engineers submitted by the Committee to the District.

  • It is recognized by the parties hereto that the District in its operation of the Wanapum Development and in the delivery of the power hereunder to the Purchaser, must comply with the requirements of the Bond Resolution and with the Federal Power Commission License, and it is therefore accordingly agreed that this Power Sales Contract is made subject to the terms and provisions of the Bond Resolution and said License.

  • Carlon asked that the record reflect that NMFS recommended that the 2014 juvenile survival study include the Wanapum Development during the meeting.

  • All written Committee recommendations not approved by the District with respect to amounts to be charged to the Wanapum Development as a result of voluntary payments in lieu of taxes or other voluntary donations made by the District may be arbitrated in accordance with subsection 13(d) hereof.

  • In considering said recommendations, the District shall give due regard to the objective of achieving from the Wanapum Development the optimum electric power production consistent with economy, reliability and facility of operation and the District's statutory duties.


More Definitions of Wanapum Development

Wanapum Development means the second stage of the Priest Rapids Project as more fully described in Section 2.2 of District Resolution No. 474, which is attached as Exhibit A, but shall not include any generation, transmission and distribution facilities hereafter constructed or
Wanapum Development means those properties and facilities consisting of the Wanapum dam, site, reservoir, switchyard and power plant, including all generating facilities associated therewith up to and including the first eight (8) main turbine generator units each with a nameplate rating of approximately 71,250 kilowatts, and associated transmission facilities in the immediate vicinity of said switchyard and an undivided one-half interest in the interconnecting facilities between Priest Rapids switchyard and Wanapum switchyard.
Wanapum Development means the second stage of the Priest Rapids Hydroelectric Project (F.P.C. (or FERC) Project No. 2114), as more fully described in Section 2.2 of Resolution

Related to Wanapum Development

  • Infill development means new construction on a vacant commercial lot currently held as open space.

  • Existing development means development, other than that associated with agricultural or forest management activities, that meets one of the following criteria:

  • experimental development means acquiring, combining, shaping and using existing scientific, technological, business and other relevant knowledge and skills with the aim of developing new or improved products, processes or services. This may also include, for example, activities aiming at the conceptual definition, planning and documentation of new products, processes or services;

  • Planned development means a real property development other than a community apartment project, a condominium project, or a stock cooperative, having either or both of the following features:

  • Commercial Development means any development on private land that is not heavy industrial or residential. The category includes, but is not limited to: hospitals, laboratories and other medical facilities, educational institutions, recreational facilities, plant nurseries, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses and other light industrial complexes.

  • Development means any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.

  • Clinical Development means the conduct of clinical trials in humans to assess the dosing, safety and/or efficacy of the Product, including but not limited to Phase I Clinical Trials, Phase II Clinical Trials, Phase Ill Clinical Trials and Phase IV Clinical Trials.

  • Economic development means all powers expressly granted and reasonably inferred pursuant to SDCL § 9-54.

  • Mixed use development means a Building used, designed or intended for Residential and Non-Residential uses, where:

  • Major development means an individual “development,” as well as multiple developments that individually or collectively result in:

  • Research and development means (1) theoretical analysis, exploration, or experimentation; or (2) the extension of investigative findings and theories of a scientific or technical nature into practical application for experimental and demonstration purposes, including the experimental production and testing of models, devices, equipment, materials, and processes. Research and development does not include the internal or external administration of radiation or radioactive material to human beings.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • spatial development framework means the Mhlontlo Municipal Spatial Development Framework prepared and adopted in terms of sections 20 and 21 of the Act and Chapter 2 of this By-Law;

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Substantial development means any development of which the total cost or fair market value exceeds two thousand five hundred dollars, or any development which materially interferes with the normal public use of the water or shorelines of the state; except that the following shall not be considered substantial developments for the purpose of this chapter:

  • Commencement of Development means the date on which any material operation (as defined in Section 56(4) of the Act) forming part of the Development begins to be carried out other than (for the purposes of this Deed and for no other purpose) operations consisting of site clearance, demolition work, archaeological investigations, investigations for the purpose of assessing ground conditions, remedial work in respect of any contamination or other adverse ground conditions, diversion and laying of services, erection of any temporary means of enclosure, the temporary display of site notices or advertisements and “Commence Development” shall be construed accordingly.

  • Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.

  • New development means development resulting from the conversion of previously undeveloped land or agricultural land uses.

  • Residential Development means lands, buildings or structures developed or to be developed for residential use;

  • Development Area means that area to which a development plan is applicable.

  • sustainable development means development that meets the needs of the present generation without compromising the ability of future generations to meet their own needs;

  • Cluster development means a contiguous cluster or

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Housing development as used in this section, means a development project for five or more residential units, including mixed-use developments. For the purposes of this section, “housing development” also includes a subdivision or common interest development, as defined in Section 4100 of the Civil Code, approved by a city, county, or city and county and consists of residential units or unimproved residential lots and either a project to substantially rehabilitate and convert an existing commercial building to residential use or the substantial rehabilitation of an existing multifamily dwelling, as defined in subdivision (d) of Section 65863.4, where the result of the rehabilitation would be a net increase in available residential units. For the purpose of calculating a density bonus, the residential units shall be on contiguous sites that are the subject of one development application, but do not have to be based upon individual subdivision maps or parcels. The density bonus shall be permitted in geographic areas of the housing development other than the areas where the units for the lower income households are located.

  • Initial Development Plan has the meaning set forth in Section 3.2(b).

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.