Accelerated weathering Sample Clauses

Accelerated weathering. When tested as specified in 4.3.10, the colored samples after weathering shall be in conformance with 3.2.7. The directional reflectance of white paint shall meet the requirement in Table 1. After performing the scrub resistance test in accordance with 4.3.12, the paint shall be in conformance with 3.2.13.
AutoNDA by SimpleDocs
Accelerated weathering. 4.3.10.1 Sample preparation. Apply the paint at a wet film thickness of 0.33 mm (0.013 in) to four 8 by 15 cm solvent-cleaned aluminum panels. Air-dry the sample for 48 hours under standard conditions. Downloaded from xxxx://xxx.xxxxxxxxx.xxx TT-P-1952F

Related to Accelerated weathering

  • Severe Weather An employee who is late for a scheduled shift during a severe weather day will be offered the opportunity to work his/her full regular schedule of hours if work is needed, without suffering any pay deductions taken from such employee’s regular scheduled work day providing such employee completes his/her shift. Severe weather days are days when weather hampers mass transit (e.g. buses and ferries) from transporting travelers to their destinations. If weather conditions are such that driving to work would be hazardous, roads are closed, or travel to work would result in extreme hardship, an employee may use his/her PTO time if unable to report for work. EIB is not available for severe weather days. Employees are required to provide notification as soon as practicable if they are going to be late or unable to report for work.

  • Inclement Weather 24.1 This Inclement Weather clause sets out the full rights, obligations and entitlements of the parties and establishes the conditions under which payment for periods of inclement weather shall be made.

  • CURVE WIDENING The minimum widening placed on the inside of curves is:  6 feet for curves of 50 to 79 feet radius.  4 feet for curves of 80 to 100 feet radius.

  • Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:

  • Overcrowding The number of people who may live in a Let Property depends on the number and size of the rooms, and the age, gender and relationships of the people. Living rooms and bedrooms are counted as rooms, but not the kitchen or bathroom. The Tenant must not allow the Let Property to become overcrowded. If the Let Property does become overcrowded, the Landlord can take action to evict the Tenant as the Tenant has breached this term of this Agreement.

  • Missed Meal Breaks (a) (applicable to full-time employees only) If an employee is authorized to work, during the lunch break, due to the requirements of patient care, he will be paid time and one-half (1½) his regular straight time hourly rate for all time worked in excess of his normal daily hours.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

  • CLEC OUTAGE For a problem limited to one CLEC (or a building with multiple CLECs), BellSouth has several options available for restoring service quickly. For those CLECs that have agreements with other CLECs, BellSouth can immediately start directing traffic to a provisional CLEC for completion. This alternative is dependent upon BellSouth having concurrence from the affected CLECs. Whether or not the affected CLECs have requested a traffic transfer to another CLEC will not impact BellSouth's resolve to re-establish traffic to the original destination as quickly as possible.

Time is Money Join Law Insider Premium to draft better contracts faster.