Aerial Construction Sample Clauses

Aerial Construction. Subject to prior approval by both parties (which approval shall not be unreasonably withheld), aerial construction methods will only be used when buried construction techniques are impractical due to environmental conditions, schedule or economic considerations, right-of-way issues, or code restrictions. The parties acknowledge that aerial construction on utility towers (not utility poles) using optical groundwire or all dielectric self-support methods may be used without GTE approval provided QWEST agrees to give GTE reasonable prior notice of its decision to use such aerial methods. Aerial design standards and construction techniques will conform with industry- accepted practices for aerial fiber optic cable systems. All aerial plant must comply with applicable national (NEC, NESC, etc.), state and local codes. The fiber optic cable placed on an aerial system shall be armored and designed for aerial applications. The cable will be placed in accordance with manufacturer specifications. Cable tension will be monitored during placement. Cable rollers will be placed at a maximum interval of ##MATERIAL OMITTED AND SEPARATELY FILED UNDER AN APPLICATION FOR CONFIDENTIAL TREATMENT## feet. Cable expansion loops will be placed at every pole. Cable identification/warning tags will be placed at every pole. All cable splices will be buried in handholes or manholes. Cable sheath to suspension strand bonds and grounding will be performed at the first and last pole of the system and at ##MATERIAL OMITTED AND SEPARATELY FILED UNDER AN APPLICATION FOR CONFIDENTIAL TREATMENT## mile intervals. Fiber optic cable at all riser poles will be protected with galvanized steel U- guard from ##MATERIAL OMITTED AND SEPARATELY FILED UNDER AN APPLICATION FOR CONFIDENTIAL TREATMENT## inches below grade to a point ##MATERIAL OMITTED AND SEPARATELY FILED UNDER AN APPLICATION FOR CONFIDENTIAL TREATMENT## inches below the suspension strand. Conduit sweeps will be used to transition from the U-guard to either a handhole or manhole. All aerial plant will be designed and constructed with 10M EHS (Class A galvanized) suspension strand unless otherwise dictated by the pole owners or field conditions. The fiber optic cable will be double lashed to the suspension strand using 45 mil stainless lashing wire. Span length shall account for storm loading (wind and ice) in accordance with zones outlined in NESC code. Sags and tensions will be calculated in accordance with industry accepted practices and...
AutoNDA by SimpleDocs
Aerial Construction. Subject to Section 7.01 of the IRU Agreement, aerial construction methods will only be in local loop construction and in those circumstances where buried construction techniques are impractical due to environmental conditions, schedule or economic considerations, right-of-way issues or code restrictions. Aerial construction on utility structures using optical groundwire or all dielectric self-support methods may be used.

Related to Aerial Construction

  • General Construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: 1. Coordination and providing supervision to all Subcontractor and workers; 2. Posting of the prevailing wage scale; 3. Maintaining a copy of the Contractors safety program manual made available to all construction personnel; 4. Conducting weekly on-site safety meetings; 5. Completing the daily labor and construction progress log on a daily basis and submit copies to the County on a daily basis. Copies of the previous day’s reports must be submitted by 9:00AM of the following day. a. Daily labor log is to include a listing of Subcontractor(s) and a count of workers by trade providing services for the day. b. Construction progress log is to include a narrative of the Work provided by trade(s). Narrative agrees to include the various areas of the jobsite where Work was performed and any problems or conditions that were encountered. c. In the event the Contractor fails to provide a daily log and/or construction progress log, the County may impose damages against the Contractor in the amount of fifty dollars ($50.00) for each log and deduct from the Contractor’s payment request, for each day the Contractor does not provide the documentation. 6. County may suspend Contractor operations if no Contractor Superintendent is observed. All delays caused by the suspension will be the responsibility of the Contractor. No time extension or claims for cost(s) associated with the suspension will be granted by the County.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • Neutral Construction Neither party hereto may rely on any drafts of this Agreement in any interpretation of the Agreement. Both parties to this Agreement have reviewed this Agreement and have participated in its drafting and, accordingly, neither party shall attempt to invoke the normal rule of construction to the effect that ambiguities are to be resolved against the drafting party in any interpretation of this Agreement.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Liberal Construction The Covenants hereof shall be liberally construed to promote and accomplish the objectives set forth in the Recitals.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!