As-constructed Record Drawings Sample Clauses

As-constructed Record Drawings. Complete As-constructed Record Drawings, prepared by the Design Professional, showing significant changes in the Project resulting from addenda, accepted or deleted alternates, field orders, change orders, construction change directives, bulletins, and/or from the Contractor Xxxx-up Set, including marked-up prints, drawings and/or other data generated by the Contractor during the course of construction of the Project. These drawings need not include minor changes in the routing of conduit runs and plumbing lines, the exact order of wiring, receptacles, or lighting fixtures. The As- constructed Record Drawings will be submitted in the format set forth in the Design Guidelines Section 2.
AutoNDA by SimpleDocs
As-constructed Record Drawings. Within sixty (60) Days after construction completion, CONCESSIONAIRE shall furnish to the AUTHORITY one (1) complete set of electronic AutoCAD format Record Drawings and one (1) complete set of either pdf, dwf, or tif files showing the “as-constructed” Tenant Improvements. Record Drawings shall be dated and stamped by the engineer or architect of record. If by the sixtieth (60th) day after construction has been completed CONCESSIONAIRE fails to submit “as-constructed” drawings, CONCESSIONAIRE shall pay penalties in the amount of one hundred dollars ($100.00) per Day until such a time when drawings have been submitted.
As-constructed Record Drawings. Architect shall provide drawings of the final constructed condition prepared from redlines provided by the contractor.
As-constructed Record Drawings. Fee $11,000 Prepare a set of electronic documents showing significant changes in the work during construction from data furnished by Contractor. Update electronic files with all changes issued during construction by Architect and consultant team.
As-constructed Record Drawings. Within sixty (60) days after filing a Notice of Completion, which is due within ten

Related to As-constructed Record Drawings

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Sanitary Facilities - Construction 5.1 Closets shall be soundly constructed and roofed with weatherproof material. The floor of each closet shall be well drained and constructed of concrete, bricks and cement, or of other approved materials which shall be impervious to water. Every closet shall be well lighted by natural or artificial light and shall be ventilated. Each closet shall have a hinged door, capable of being fastened on the inside, lift seats/flaps and toilet paper. If closets are of single unit construction (only to be used for the formwork process), not contained within a purpose built ablution block, privacy walls which shield the closet/s from outside view shall be installed. (Privacy walls are not required for purpose built ablution blocks eg ATCO huts)

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • General Construction Obligations (a) Without limiting Section 10.3: